SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMissouriLee's Summit
MO-992398

Signature at West Pryor

2100 NW Lowenstein Dr, Lee's Summit, MO, 64081
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🅿️Parking lot
Max power
7.2 kW
AC Level 2
Ports
4
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 4 ports
Signature at West Pryor · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2100 NW Lowenstein Dr · Lee's Summit, MO · 64081

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Signature at West Pryor located?
Signature at West Pryor is located at 2100 NW Lowenstein Dr, Lee's Summit, MO.
What kind of charging does Signature at West Pryor offer?
Signature at West Pryor offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 4 total ports at this location.
How long does it take to charge an EV at Signature at West Pryor?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Signature at West Pryor. Actual times vary with vehicle, temperature, and station load.
What are Signature at West Pryor's charging hours?
Open 24 hours
What charging network operates Signature at West Pryor?
Signature at West Pryor is part of the Non-Networked network. See more Non-Networked charging across MO on SpotCharge.
Can anyone use the chargers at Signature at West Pryor?
Yes — Signature at West Pryor is a publicly accessible charging location.
Is the Signature at West Pryor listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Missouri · 2024
Plug-in vehicles
51K
#25 in US
Battery-electric
34K
67% of fleet
EVs per public port
15.9
3,207 ports listed

As of 2024, Missouri had 51,000 plug-in vehicles registered — 34,200 fully battery-electric (67%) and 16,800 plug-in hybrid (33%). That ranks Missouri #25 nationally and represents about 0.8% of all US plug-in registrations.

Across 3,207 publicly-listed ports in Missouri (1,898 Level 2 and 1,309 DC fast), that works out to roughly 15.9 EVs per public port and 26.1 BEVs per DC fast port.

Missouri has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Missouri drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Missouri market data →

More charging in Lee's Summit

See all →

SURGERYCENTERLS STATION 1

Lee's Summit, MO

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

Bob Sight Ford

Lee's Summit, MO

DC FastFORD_CHARGE
1 station · 2 ports50 kW

ADAMSTOYOTALS ADAMS PUBLIC

Lee's Summit, MO

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

EVERGY @BST WSTRN-228A

Lee's Summit, MO

Level 2ChargePoint Network
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
NA
Network
Non-Networked
Access
Public access

Data from NREL

SpotCharge · Owner-listed EV charging