SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMissouriJefferson City
MO-546159

CSMS

7000 Military Cir, Jefferson City, MO, 65101
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Fed gov
Max power
7.2 kW
AC Level 2
Ports
1
port
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 1 port
CSMS · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

7000 Military Cir · Jefferson City, MO · 65101

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is CSMS located?
CSMS is located at 7000 Military Cir, Jefferson City, MO.
What kind of charging does CSMS offer?
CSMS offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at CSMS?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at CSMS. Actual times vary with vehicle, temperature, and station load.
What are CSMS's charging hours?
Open 24 hours
What charging network operates CSMS?
CSMS is part of the Non-Networked network. See more Non-Networked charging across MO on SpotCharge.
Can anyone use the chargers at CSMS?
CSMS is listed as by appointment access — check the details before visiting.
Is the CSMS listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Missouri · 2024
Plug-in vehicles
51K
#25 in US
Battery-electric
34K
67% of fleet
EVs per public port
15.9
3,207 ports listed

As of 2024, Missouri had 51,000 plug-in vehicles registered — 34,200 fully battery-electric (67%) and 16,800 plug-in hybrid (33%). That ranks Missouri #25 nationally and represents about 0.8% of all US plug-in registrations.

Across 3,207 publicly-listed ports in Missouri (1,898 Level 2 and 1,309 DC fast), that works out to roughly 15.9 EVs per public port and 26.1 BEVs per DC fast port.

Missouri has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Missouri drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Missouri market data →

More charging in Jefferson City

See all →

Joe Machens Capital City Ford

Jefferson City, MO

DC FastLevel 2SYNERGEV
2 stations · 9 ports50 kW

Jefferson City

Jefferson City, MO

Level 2NOODOE
1 station · 4 ports7.2 kW

Culver's of Jefferson City - Tesla Destination

Jefferson City, MO

Level 2Tesla Destination
1 station · 2 ports7.2 kW

CENTRAL BANK 01-CTB MOTOR A

Jefferson City, MO

DC FastChargePoint Network
2 stations · 2 ports50 kW
Details
Hours
Open 24 hours
Network
Non-Networked
Access
By appointment

Last updated · 6 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging