SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMissouriCreve Coeur
MO-497008

First Bank Corporate HQ

11901 Olive Blvd, Creve Coeur, MO, 63141

First Bank Corporate HQ is an EV charging location in Creve Coeur, MO with 2 Level 2 charging ports up to 12 kW on the ChargeLab network. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2024
Max power
11.5 kW
AC Level 2
Ports
2
ports
Hours
—
Pricing
—

Stations & ports

1 station · 2 ports
First Bank Corporate HQ · L2 J1772 11.5 kW
CHARGELAB
AC L2 · 11.5 kW

11.5 kW adds roughly 40 miles of range per hour for a typical EV.

Start session on CHARGELAB network →
1AJ1772· 11.5 kW
1BJ1772· 11.5 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

11901 Olive Blvd · Creve Coeur, MO · 63141

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is First Bank Corporate HQ located?
First Bank Corporate HQ is located at 11901 Olive Blvd, Creve Coeur, MO.
What kind of charging does First Bank Corporate HQ offer?
First Bank Corporate HQ offers Level 2 (AC) charging, with stations rated up to 11.5 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at First Bank Corporate HQ?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at First Bank Corporate HQ. Actual times vary with vehicle, temperature, and station load.
What charging network operates First Bank Corporate HQ?
First Bank Corporate HQ is part of the ChargeLab network. See more ChargeLab charging across MO on SpotCharge.
Can anyone use the chargers at First Bank Corporate HQ?
Yes — First Bank Corporate HQ is a publicly accessible charging location.
Is the First Bank Corporate HQ listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Missouri · 2024
Plug-in vehicles
51K
#25 in US
Battery-electric
34K
67% of fleet
EVs per public port
14.9
3,418 ports listed

As of 2024, Missouri had 51,000 plug-in vehicles registered — 34,200 fully battery-electric (67%) and 16,800 plug-in hybrid (33%). That ranks Missouri #25 nationally and represents about 0.8% of all US plug-in registrations.

Across 3,418 publicly-listed ports in Missouri (2,043 Level 2 and 1,375 DC fast), that works out to roughly 14.9 EVs per public port and 24.9 BEVs per DC fast port.

Missouri has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Missouri drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Missouri market data →

More charging in Creve Coeur

See all →

MetLife - Creve Coeur

Creve Coeur, MO

Level 2
1 station · 4 ports

The Nest on Olive

Creve Coeur, MO

Level 2AmpUp
1 station · 1 port

BJC THANKS YOU CT4021

Creve Coeur, MO

Level 2ChargePoint
1 station · 2 ports6.5 kW

PMB CHARGEPOINT PMB LOT 1

Creve Coeur, MO

Level 2ChargePoint
1 station · 2 ports
Details
Phone
800-636-0986
Network
ChargeLab ↗
Access
Public access

Verified by NREL · 1 day ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id360213
zip63141
cityCreve Coeur
plus4—
stateMO
ng_psi—
cng_psi—
countryUS
latitude38.671982
bd_blends—
longitude-90.445319
open_date2024-10-17
rd_blends—
ev_networkCHARGELAB
ev_pricing—
updated_at2026-09-19T04:19:28Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameFirst Bank Corporate HQ
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone800-636-0986
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "018c0d5e-f406-48e9-9f75-a3e612fa3aa0**1",
    "054baf04-f840-4213-998a-b69653ccd5f4**1"
  ],
  "station": [
    "125-67c0963479f80ff64ddce02d"
  ]
}
ev_network_webhttps://chargelab.co
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address11901 Olive Blvd
funding_sources—
owner_type_code—
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "CHARGELAB",
    "connectors": {
      "J1772": {
        "power_kw": 11.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "CHARGELAB",
    "connectors": {
      "J1772": {
        "power_kw": 11.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-19
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging