SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMissouriRidgedale
MO-389891

Big Cedar - Top of the Rock

150 Top of the Rock Rd, Ridgedale, MO, 65739
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏨Hotel
Max power
7.2 kW
AC Level 2
Ports
1
port
Hours
24/7
Open 24 hours
Pricing
Free
Free

Stations & ports

1 station · 1 port
Big Cedar - Top of the Rock · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

150 Top of the Rock Rd · Ridgedale, MO · 65739

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Big Cedar - Top of the Rock located?
Big Cedar - Top of the Rock is located at 150 Top of the Rock Rd, Ridgedale, MO.
What kind of charging does Big Cedar - Top of the Rock offer?
Big Cedar - Top of the Rock offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at Big Cedar - Top of the Rock?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Big Cedar - Top of the Rock. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Big Cedar - Top of the Rock?
Free
What are Big Cedar - Top of the Rock's charging hours?
Open 24 hours
What charging network operates Big Cedar - Top of the Rock?
Big Cedar - Top of the Rock is part of the Non-Networked network. See more Non-Networked charging across MO on SpotCharge.
Can anyone use the chargers at Big Cedar - Top of the Rock?
Yes — Big Cedar - Top of the Rock is a publicly accessible charging location.
Is the Big Cedar - Top of the Rock listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Missouri · 2024
Plug-in vehicles
51K
#25 in US
Battery-electric
34K
67% of fleet
EVs per public port
15.9
3,207 ports listed

As of 2024, Missouri had 51,000 plug-in vehicles registered — 34,200 fully battery-electric (67%) and 16,800 plug-in hybrid (33%). That ranks Missouri #25 nationally and represents about 0.8% of all US plug-in registrations.

Across 3,207 publicly-listed ports in Missouri (1,898 Level 2 and 1,309 DC fast), that works out to roughly 15.9 EVs per public port and 26.1 BEVs per DC fast port.

Missouri has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Missouri drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Missouri market data →

More charging in Ridgedale

See all →

Big Cedar - Fun Mountain

Ridgedale, MO

Level 2Non-Networked
1 station · 1 port7.2 kW

The Cliffs at Long Creek

Ridgedale, MO

Level 2Non-Networked
1 station · 2 ports7.2 kW

Rentbranson - Ridgedale

Ridgedale, MO

Level 2Tesla Destination
1 station · 12 ports10 kW
Details
Hours
Open 24 hours
Pricing
Free
Phone
417-335-2777
Network
Non-Networked
Access
Public access

Data from NREL

SpotCharge · Owner-listed EV charging