SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMissouriHazelwood
MO-370204

TOYOTA MAIN NORTH LOT CUST

9095 Dunn Road, Hazelwood, MO, 63042
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
TOYOTA MAIN NORTH LOT CUST · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

9095 Dunn Road · Hazelwood, MO · 63042

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is TOYOTA MAIN NORTH LOT CUST located?
TOYOTA MAIN NORTH LOT CUST is located at 9095 Dunn Road, Hazelwood, MO.
What kind of charging does TOYOTA MAIN NORTH LOT CUST offer?
TOYOTA MAIN NORTH LOT CUST offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at TOYOTA MAIN NORTH LOT CUST?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at TOYOTA MAIN NORTH LOT CUST. Actual times vary with vehicle, temperature, and station load.
What are TOYOTA MAIN NORTH LOT CUST's charging hours?
Open 24 hours
What charging network operates TOYOTA MAIN NORTH LOT CUST?
TOYOTA MAIN NORTH LOT CUST is part of the ChargePoint Network network. See more ChargePoint Network charging across MO on SpotCharge.
Can anyone use the chargers at TOYOTA MAIN NORTH LOT CUST?
Yes — TOYOTA MAIN NORTH LOT CUST is a publicly accessible charging location.
Is the TOYOTA MAIN NORTH LOT CUST listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Missouri · 2024
Plug-in vehicles
51K
#25 in US
Battery-electric
34K
67% of fleet
EVs per public port
15.9
3,207 ports listed

As of 2024, Missouri had 51,000 plug-in vehicles registered — 34,200 fully battery-electric (67%) and 16,800 plug-in hybrid (33%). That ranks Missouri #25 nationally and represents about 0.8% of all US plug-in registrations.

Across 3,207 publicly-listed ports in Missouri (1,898 Level 2 and 1,309 DC fast), that works out to roughly 15.9 EVs per public port and 26.1 BEVs per DC fast port.

Missouri has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Missouri drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Missouri market data →

More charging in Hazelwood

See all →

TOYOTA MAIN SHOP

Hazelwood, MO

Level 2ChargePoint Network
1 station · 1 port7.2 kW

THE BOEING CO STL 300-1

Hazelwood, MO

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

AMERICAN METALS STATION 1

Hazelwood, MO

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

OSM Charger #n12917566744

Hazelwood, MO

DC FastChargePoint
2 stations · 2 ports50 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging