SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMissouriSikeston
MO-115587

MORLAN FORD FORD L2 - 3

1030 S Main St, Sikeston, MO, 63801

MORLAN FORD FORD L2 - 3 is an EV charging location in Sikeston, MO with 2 Level 2 charging ports up to 19 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2024
Max power
19.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

1 station · 2 ports
MORLAN FORD FORD L2 - 3 · L2 J1772 19.2 kW
ChargePoint Network
AC L2 · 19.2 kW

19.2 kW adds roughly 65 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 19.2 kW
1BJ1772· 19.2 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1030 S Main St · Sikeston, MO · 63801

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is MORLAN FORD FORD L2 - 3 located?
MORLAN FORD FORD L2 - 3 is located at 1030 S Main St, Sikeston, MO.
What kind of charging does MORLAN FORD FORD L2 - 3 offer?
MORLAN FORD FORD L2 - 3 offers Level 2 (AC) charging, with stations rated up to 19.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at MORLAN FORD FORD L2 - 3?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at MORLAN FORD FORD L2 - 3. Actual times vary with vehicle, temperature, and station load.
What are MORLAN FORD FORD L2 - 3's charging hours?
24 hours daily
What charging network operates MORLAN FORD FORD L2 - 3?
MORLAN FORD FORD L2 - 3 is part of the ChargePoint network. See more ChargePoint charging across MO on SpotCharge.
Can anyone use the chargers at MORLAN FORD FORD L2 - 3?
Yes — MORLAN FORD FORD L2 - 3 is a publicly accessible charging location.
Is the MORLAN FORD FORD L2 - 3 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Missouri · 2024
Plug-in vehicles
51K
#25 in US
Battery-electric
34K
67% of fleet
EVs per public port
14.9
3,418 ports listed

As of 2024, Missouri had 51,000 plug-in vehicles registered — 34,200 fully battery-electric (67%) and 16,800 plug-in hybrid (33%). That ranks Missouri #25 nationally and represents about 0.8% of all US plug-in registrations.

Across 3,418 publicly-listed ports in Missouri (2,043 Level 2 and 1,375 DC fast), that works out to roughly 14.9 EVs per public port and 24.9 BEVs per DC fast port.

Missouri has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Missouri drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Missouri market data →

More charging in Sikeston

See all →

TownePlace Suites by Marriott

Sikeston, MO

Level 2
1 station · 2 ports8 kW

SIKESTON DT DT KINGSHIWAY

Sikeston, MO

Level 2ChargePoint
1 station · 2 ports6.5 kW

MORLAN FORD FORD DC 1

Sikeston, MO

DC FastChargePoint
1 station · 2 ports120 kW

MORLAN FORD FORD DC2

Sikeston, MO

DC FastChargePoint
1 station · 2 ports120 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id327725
zip63801
citySikeston
plus4—
stateMO
ng_psi—
cng_psi—
countryUS
latitude36.867025
bd_blends—
longitude-89.57942
open_date2024-02-07
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-18T02:37:39Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameMORLAN FORD FORD L2 - 3
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "25025641",
    "25025651"
  ],
  "station": [
    "USCPIL15468311"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address1030 S Main St
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging