SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMinnesotaWaite Park
MN-903173

St. Cloud Honda

1500 Hwy 23, Waite Park, MN, 56387
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
50 kW
DC fast
Ports
3
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

2 stations · 3 ports
St. Cloud Honda · DCFC CCS
Blink Network
DC fast · 50 kW
Start session on Blink Network network →
1ACCS· 50 kW· 480V/100A
St. Cloud Honda · L2 J1772
Blink Network
AC L2 · 7.2 kW
Start session on Blink Network network →
2AJ1772· 7.2 kW· 240V/30A
2BJ1772· 7.2 kW· 240V/30A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min
Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1500 Hwy 23 · Waite Park, MN · 56387

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is St. Cloud Honda located?
St. Cloud Honda is located at 1500 Hwy 23, Waite Park, MN.
What kind of charging does St. Cloud Honda offer?
St. Cloud Honda offers DC fast charging and Level 2 (AC) charging, with stations rated up to 50 kW. There are 2 charging stations and 3 total ports at this location.
How long does it take to charge an EV at St. Cloud Honda?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging, or about 8 h 6 min on 7.2 kW Level 2 (AC) charging at St. Cloud Honda. Actual times vary with vehicle, temperature, and station load.
What are St. Cloud Honda's charging hours?
Open 24 hours
What charging network operates St. Cloud Honda?
St. Cloud Honda is part of the Blink Network network. See more Blink Network charging across MN on SpotCharge.
Can anyone use the chargers at St. Cloud Honda?
Yes — St. Cloud Honda is a publicly accessible charging location.
Is the St. Cloud Honda listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Minnesota · 2024
Plug-in vehicles
68K
#21 in US
Battery-electric
47K
70% of fleet
EVs per public port
22.2
3,046 ports listed

As of 2024, Minnesota had 67,500 plug-in vehicles registered — 47,400 fully battery-electric (70%) and 20,100 plug-in hybrid (30%). That ranks Minnesota #21 nationally and represents about 1.1% of all US plug-in registrations.

Across 3,046 publicly-listed ports in Minnesota (1,770 Level 2 and 1,265 DC fast), that works out to roughly 22.2 EVs per public port and 37.5 BEVs per DC fast port.

Minnesota's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Minnesota market data →

More charging in Waite Park

See all →

St. Cloud Hyundai

Waite Park, MN

DC FastBlink Network
1 station · 4 ports50 kW

22021 SHOP STATION 1

Waite Park, MN

Level 2ChargePoint Network
1 station · 1 port7.2 kW
Details
Hours
Open 24 hours
Phone
888-998-2546
Network
Blink Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging