SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMinnesotaAustin
MN-730126

Mill on Main

704 1st Drive Northwest, Austin, MN, 55912

Mill on Main is an EV charging location in Austin, MN with 2 Level 2 charging ports on the Blink network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Public access. Listing data from NREL, last confirmed June 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
—
AC Level 2
Ports
2
ports
Hours
—
Pricing
—

Stations & ports

1 station · 2 ports
Mill on Main · L2 J1772
Blink Network
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

Start session on Blink Network network →
1AJ1772
1BJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

704 1st Drive Northwest · Austin, MN · 55912

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Mill on Main located?
Mill on Main is located at 704 1st Drive Northwest, Austin, MN.
What kind of charging does Mill on Main offer?
Mill on Main offers Level 2 (AC) charging. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Mill on Main?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at Mill on Main. Actual times vary with vehicle, temperature, and station load.
What charging network operates Mill on Main?
Mill on Main is part of the Blink network. See more Blink charging across MN on SpotCharge.
Can anyone use the chargers at Mill on Main?
Yes — Mill on Main is a publicly accessible charging location.
Is the Mill on Main listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Minnesota · 2024
Plug-in vehicles
68K
#21 in US
Battery-electric
47K
70% of fleet
EVs per public port
19.7
3,428 ports listed

As of 2024, Minnesota had 67,500 plug-in vehicles registered — 47,400 fully battery-electric (70%) and 20,100 plug-in hybrid (30%). That ranks Minnesota #21 nationally and represents about 1.1% of all US plug-in registrations.

Across 3,428 publicly-listed ports in Minnesota (1,970 Level 2 and 1,447 DC fast), that works out to roughly 19.7 EVs per public port and 32.8 BEVs per DC fast port.

Minnesota has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Minnesota drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Minnesota market data →

More charging in Austin

See all →

AU Office Lvl 2

Austin, MN

Level 2ZEFNET
1 station · 1 port

JCHNATURECENTER CSN-01654351

Austin, MN

Level 2ChargePoint
1 station · 2 ports6.5 kW

AU Riverland charger

Austin, MN

Level 2ZEFNET
1 station · 2 ports

R&D Lab

Austin, MN

Level 2Blink
1 station · 2 ports12 kW
Details
Phone
888-998-2546
Network
Blink ↗
Access
Public access

Last updated · 3 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging