SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMinnesotaNew Brighton
MN-399087

Sunny Square Park

2200 Sunnyside Terrace, New Brighton, MN, 55112

Sunny Square Park is an EV charging location in New Brighton, MN with 6 DC fast and Level 2 charging ports up to 24 kW on the Dirt Road network. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2026
Max power
24 kW
DC fast
Ports
6
ports
Hours
—
Pricing
—

Stations & ports

2 stations · 6 ports
Sunny Square Park · DCFC CCS 24 kW
DIRT_ROAD
DC fast · 24 kW

24 kW adds roughly 100 miles in about an hour, depending on the car.

Start session on DIRT_ROAD network →
1ACCS· 24 kW
1BCCS· 24 kW
1CCCS· 24 kW
1DCCS· 24 kW
Sunny Square Park · L2 J1772 7.2 kW
DIRT_ROAD
AC L2 · 7.2 kW

7.2 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on DIRT_ROAD network →
2AJ1772· 7.2 kW
2BJ1772· 7.2 kW

Estimated charging time

DC fast charging · 24 kW
~2 h 26 min
Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2200 Sunnyside Terrace · New Brighton, MN · 55112

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Sunny Square Park located?
Sunny Square Park is located at 2200 Sunnyside Terrace, New Brighton, MN.
What kind of charging does Sunny Square Park offer?
Sunny Square Park offers DC fast charging and Level 2 (AC) charging, with stations rated up to 24 kW. There are 2 charging stations and 6 total ports at this location.
How long does it take to charge an EV at Sunny Square Park?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 2 h 26 min on 24 kW DC fast charging, or about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Sunny Square Park. Actual times vary with vehicle, temperature, and station load.
What charging network operates Sunny Square Park?
Sunny Square Park is part of the Dirt Road network. See more Dirt Road charging across MN on SpotCharge.
Can anyone use the chargers at Sunny Square Park?
Yes — Sunny Square Park is a publicly accessible charging location.
Is the Sunny Square Park listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Minnesota · 2024
Plug-in vehicles
68K
#21 in US
Battery-electric
47K
70% of fleet
EVs per public port
19.7
3,428 ports listed

As of 2024, Minnesota had 67,500 plug-in vehicles registered — 47,400 fully battery-electric (70%) and 20,100 plug-in hybrid (30%). That ranks Minnesota #21 nationally and represents about 1.1% of all US plug-in registrations.

Across 3,428 publicly-listed ports in Minnesota (1,970 Level 2 and 1,447 DC fast), that works out to roughly 19.7 EVs per public port and 32.8 BEVs per DC fast port.

Minnesota has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Minnesota drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Minnesota market data →

More DC fast charging

DC fast charging in New Brighton →DC fast charging in Minnesota →Dirt Road in Minnesota →

More charging in New Brighton

See all →

Public Safety

New Brighton, MN

DC FastLevel 2Dirt Road
2 stations · 6 ports24 kW

City Hall

New Brighton, MN

DC FastLevel 2Dirt Road
2 stations · 6 ports24 kW

Brightwood Hills Golf Course

New Brighton, MN

DC FastLevel 2Dirt Road
2 stations · 6 ports24 kW

Community Center

New Brighton, MN

DC FastLevel 2Dirt Road
2 stations · 4 ports180 kW
Details
Phone
888-401-3738
Network
Dirt Road ↗
Access
Public access

Verified by NREL · 6 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id457359
zip55112
cityNew Brighton
plus4—
stateMN
ng_psi—
cng_psi—
countryUS
latitude45.0916
bd_blends—
longitude-93.216
open_date2026-04-09
rd_blends—
ev_networkDIRT_ROAD
ev_pricing—
updated_at2026-09-14T05:38:59Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameSunny Square Park
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-401-3738
cards_accepted—
ev_dc_fast_num2
ev_network_ids
{
  "posts": [
    "7CS1-6-2247-00024",
    "7CS1-6-2247-00067",
    "TWBUL-IT1-4321-214",
    "TWBUL-IT1-4321-222"
  ],
  "station": [
    "200"
  ]
}
ev_network_webhttps://www.carbonsolutionsgroup.com/ev-charging/drivers/
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address2200 Sunnyside Terrace
funding_sources—
owner_type_code—
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "DIRT_ROAD",
    "connectors": {
      "J1772": {
        "power_kw": 7.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "DIRT_ROAD",
    "connectors": {
      "J1772": {
        "power_kw": 7.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "DIRT_ROAD",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 24,
        "port_count": 2
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "DIRT_ROAD",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 24,
        "port_count": 2
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-14
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging