SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMinnesotaMoorhead
MN-390213

Noodles and Co

922 Holiday Dr, Moorhead, MN, 56560

Noodles and Co is an EV charging location in Moorhead, MN with 4 DC fast and Level 2 charging ports up to 50 kW on the ZEFNET network. Public access. Listing data from OpenChargeMap, last refreshed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
50 kW
DC fast
Ports
4
ports
Hours
—
Pricing
—

About this location

24 hours daily

Stations & ports

3 stations · 4 ports
Noodles and Co · J1772 3.7kW
ZEF Energy
AC L2 · 3.7 kW

3.7 kW adds roughly 15 miles of range per hour for a typical EV.

1AJ1772· 3.7 kW· 230V/16A
1BJ1772· 3.7 kW· 230V/16A
Noodles and Co · CHAdeMO 50kW
ZEF Energy
DC fast · 50 kW

50 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

2ACHAdeMO· 50 kW
Noodles and Co · CCS 50kW
ZEF Energy
DC fast · 50 kW

50 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

3ACCS· 50 kW

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min
Level 2 (AC) · 3.7 kW
~15 h 46 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

922 Holiday Dr · Moorhead, MN · 56560

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Noodles and Co located?
Noodles and Co is located at 922 Holiday Dr, Moorhead, MN.
What kind of charging does Noodles and Co offer?
Noodles and Co offers DC fast charging and Level 2 (AC) charging, with stations rated up to 50 kW. There are 3 charging stations and 4 total ports at this location.
How long does it take to charge an EV at Noodles and Co?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging, or about 15 h 46 min on 3.7 kW Level 2 (AC) charging at Noodles and Co. Actual times vary with vehicle, temperature, and station load.
What charging network operates Noodles and Co?
Noodles and Co is part of the ZEFNET network. See more ZEFNET charging across MN on SpotCharge.
Can anyone use the chargers at Noodles and Co?
Yes — Noodles and Co is a publicly accessible charging location.
Is the Noodles and Co listing owner-managed?
Not yet. This page was generated from open charging data (OpenChargeMap) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Minnesota · 2024
Plug-in vehicles
68K
#21 in US
Battery-electric
47K
70% of fleet
EVs per public port
19.7
3,428 ports listed

As of 2024, Minnesota had 67,500 plug-in vehicles registered — 47,400 fully battery-electric (70%) and 20,100 plug-in hybrid (30%). That ranks Minnesota #21 nationally and represents about 1.1% of all US plug-in registrations.

Across 3,428 publicly-listed ports in Minnesota (1,970 Level 2 and 1,447 DC fast), that works out to roughly 19.7 EVs per public port and 32.8 BEVs per DC fast port.

Minnesota has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Minnesota drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Minnesota market data →

More DC fast charging

DC fast charging in Moorhead →DC fast charging in Minnesota →ZEFNET in Minnesota →

More charging in Moorhead

See all →

MSTATE PUBLIC CPE250-1

Moorhead, MN

DC FastChargePoint
2 stations · 2 ports125 kW

Noodles & Company

Moorhead, MN

DC FastZEFNET
2 stations · 2 ports
Details
Phone
218-512-2040
Network
ZEFNET ↗
Access
Public access

Data from OpenChargeMap

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

OpenChargeMap13 fields▾

From OpenChargeMap · CC-BY-SA 4.0

ID116145
UUID6E268BB0-65F5-4E6B-8D66-397C9663353D
OperatorID3454
AddressInfo
{
  "ID": 116491,
  "Town": "Moorhead",
  "Title": "Noodles and Co",
  "Latitude": 46.849465,
  "Postcode": "56560",
  "CountryID": 2,
  "Longitude": -96.76724,
  "RelatedURL": "",
  "AddressLine1": "922 Holiday Dr",
  "DistanceUnit": 0,
  "AccessComments": "24 hours daily",
  "StateOrProvince": "MN",
  "ContactTelephone1": "218-512-2040"
}
Connections
[
  {
    "ID": 163210,
    "Amps": 16,
    "LevelID": 2,
    "PowerKW": 3.7,
    "Voltage": 230,
    "Comments": "kW power is an estimate based on the connection type",
    "Quantity": 2,
    "CurrentTypeID": 10,
    "ConnectionTypeID": 1
  },
  {
    "ID": 163211,
    "LevelID": 3,
    "PowerKW": 50,
    "Comments": "kW power is an estimate based on the connection type",
    "Quantity": 1,
    "CurrentTypeID": 30,
    "ConnectionTypeID": 2
  },
  {
    "ID": 163212,
    "LevelID": 3,
    "PowerKW": 50,
    "Comments": "kW power is an estimate based on the connection type",
    "Quantity": 1,
    "CurrentTypeID": 30,
    "ConnectionTypeID": 32
  }
]
DateCreated2019-02-11T07:13:00Z
UsageTypeID1
OperatorInfo
{
  "ID": 3454,
  "Title": "ZEF Energy",
  "Comments": null,
  "BookingURL": null,
  "WebsiteURL": "https://www.zefenergy.com/",
  "AddressInfo": null,
  "ContactEmail": "solutions@zefenergy.com",
  "FaultReportEmail": null,
  "IsRestrictedEdit": false,
  "IsPrivateIndividual": false,
  "PhonePrimaryContact": "612.688.4596",
  "PhoneSecondaryContact": null
}
StatusTypeID50
DataProviderID1
DateLastVerified2023-12-20T15:39:00Z
DateLastStatusUpdate2023-12-20T15:39:00Z
SubmissionStatusTypeID100
SpotCharge · Data via OpenChargeMap