SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMinnesotaPlymouth
MN-319750

Parkers Lake Playfield

15500 County Road 6, Plymouth, MN, 55447
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
50 kW
DC fast
Ports
7
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

2 stations · 7 ports
Parkers Lake Playfield · L2 J1772
DIRT_ROAD
AC L2 · 7.2 kW
Start session on DIRT_ROAD network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A
1EJ1772· 7.2 kW· 240V/30A
1FJ1772· 7.2 kW· 240V/30A
Parkers Lake Playfield · DCFC CCS
DIRT_ROAD
DC fast · 50 kW
Start session on DIRT_ROAD network →
2ACCS· 50 kW· 480V/100A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min
Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

15500 County Road 6 · Plymouth, MN · 55447

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Parkers Lake Playfield located?
Parkers Lake Playfield is located at 15500 County Road 6, Plymouth, MN.
What kind of charging does Parkers Lake Playfield offer?
Parkers Lake Playfield offers DC fast charging and Level 2 (AC) charging, with stations rated up to 50 kW. There are 2 charging stations and 7 total ports at this location.
How long does it take to charge an EV at Parkers Lake Playfield?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging, or about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Parkers Lake Playfield. Actual times vary with vehicle, temperature, and station load.
What are Parkers Lake Playfield's charging hours?
Open 24 hours
What charging network operates Parkers Lake Playfield?
Parkers Lake Playfield is part of the DIRT_ROAD network. See more DIRT_ROAD charging across MN on SpotCharge.
Can anyone use the chargers at Parkers Lake Playfield?
Yes — Parkers Lake Playfield is a publicly accessible charging location.
Is the Parkers Lake Playfield listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Minnesota · 2024
Plug-in vehicles
68K
#21 in US
Battery-electric
47K
70% of fleet
EVs per public port
22.2
3,046 ports listed

As of 2024, Minnesota had 67,500 plug-in vehicles registered — 47,400 fully battery-electric (70%) and 20,100 plug-in hybrid (30%). That ranks Minnesota #21 nationally and represents about 1.1% of all US plug-in registrations.

Across 3,046 publicly-listed ports in Minnesota (1,770 Level 2 and 1,265 DC fast), that works out to roughly 22.2 EVs per public port and 37.5 BEVs per DC fast port.

Minnesota's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Minnesota market data →

More charging in Plymouth

See all →

NW Greenway North

Plymouth, MN

DC FastLevel 2DIRT_ROAD
2 stations · 7 ports50 kW

West Medicine Lake

Plymouth, MN

DC FastLevel 2DIRT_ROAD
2 stations · 7 ports50 kW

East Medicine Lake

Plymouth, MN

DC FastLevel 2DIRT_ROAD
2 stations · 7 ports50 kW

Parkers Lake

Plymouth, MN

DC FastLevel 2DIRT_ROAD
2 stations · 7 ports50 kW
Details
Hours
Open 24 hours
Phone
888-401-3738
Network
DIRT_ROAD ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging