SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMinnesotaBrooklyn Park
MN-255932

MISS. GATEWAY MGRP WEST 1

10407 West River Road, Brooklyn Park, MN, 55444

MISS. GATEWAY MGRP WEST 1 is an EV charging location in Brooklyn Park, MN with 2 Level 2 charging ports up to 13 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2026
Max power
13.4 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 2 ports
MISS. GATEWAY MGRP WEST 1 · L2 J1772 13.4 kW
ChargePoint Network
AC L2 · 13.4 kW

13.4 kW adds roughly 45 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 13.4 kW
MISS. GATEWAY MGRP WEST 1 · L2 Tesla 13.4 kW
ChargePoint Network
AC L2 · 13.4 kW

13.4 kW adds roughly 45 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
2ATesla· 13.4 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

10407 West River Road · Brooklyn Park, MN · 55444

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is MISS. GATEWAY MGRP WEST 1 located?
MISS. GATEWAY MGRP WEST 1 is located at 10407 West River Road, Brooklyn Park, MN.
What kind of charging does MISS. GATEWAY MGRP WEST 1 offer?
MISS. GATEWAY MGRP WEST 1 offers Level 2 (AC) charging, with stations rated up to 13.4 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at MISS. GATEWAY MGRP WEST 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at MISS. GATEWAY MGRP WEST 1. Actual times vary with vehicle, temperature, and station load.
What are MISS. GATEWAY MGRP WEST 1's charging hours?
24 hours daily
What charging network operates MISS. GATEWAY MGRP WEST 1?
MISS. GATEWAY MGRP WEST 1 is part of the ChargePoint network. See more ChargePoint charging across MN on SpotCharge.
Can anyone use the chargers at MISS. GATEWAY MGRP WEST 1?
Yes — MISS. GATEWAY MGRP WEST 1 is a publicly accessible charging location.
Is the MISS. GATEWAY MGRP WEST 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Minnesota · 2024
Plug-in vehicles
68K
#21 in US
Battery-electric
47K
70% of fleet
EVs per public port
19.7
3,428 ports listed

As of 2024, Minnesota had 67,500 plug-in vehicles registered — 47,400 fully battery-electric (70%) and 20,100 plug-in hybrid (30%). That ranks Minnesota #21 nationally and represents about 1.1% of all US plug-in registrations.

Across 3,428 publicly-listed ports in Minnesota (1,970 Level 2 and 1,447 DC fast), that works out to roughly 19.7 EVs per public port and 32.8 BEVs per DC fast port.

Minnesota has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Minnesota drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Minnesota market data →

More charging in Brooklyn Park

See all →

MISS. GATEWAY MGRP EAST 1

Brooklyn Park, MN

Level 2ChargePoint
2 stations · 2 ports13.4 kW

MSP1

Brooklyn Park, MN

Level 2AmpUp
1 station · 1 port

ALLIED ER VET ALLIED 1

Brooklyn Park, MN

Level 2ChargePoint
1 station · 2 ports

HYBB ROW 2

Brooklyn Park, MN

DC FastChargePoint
2 stations · 2 ports62.5 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 1 week ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id459777
zip55444
cityBrooklyn Park
plus4—
stateMN
ng_psi—
cng_psi—
countryUS
latitude45.139073
bd_blends—
longitude-93.316844
open_date2026-05-16
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-14T03:14:44Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameMISS. GATEWAY MGRP WEST 1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "31146511"
  ],
  "station": [
    "USCPIL19872081"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address10407 West River Road
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 13.4,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": 13.4,
        "port_count": 1
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772, TESLA
ev_level1_evse_num—
ev_level2_evse_num1
access_days_time_fr—
date_last_confirmed2026-09-14
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging