SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMinnesotaMoose Lake
MN-179549

MOOSE LAKE LEVEL 3

201 Arrowhead Ln, Moose Lake, MN, 55767

MOOSE LAKE LEVEL 3 is an EV charging location in Moose Lake, MN with 2 DC fast charging ports up to 50 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from OpenChargeMap and NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2019
Max power
50 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

About this location

24 hours daily

Stations & ports

2 stations · 2 ports
MOOSE LAKE LEVEL 3 · CHAdeMO 50kW
ChargePoint
DC fast · 50 kW

50 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

1ACHAdeMO· 50 kW
MOOSE LAKE LEVEL 3 · CCS 50kW
ChargePoint
DC fast · 50 kW

50 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

2ACCS· 50 kW

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

201 Arrowhead Ln · Moose Lake, MN · 55767

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is MOOSE LAKE LEVEL 3 located?
MOOSE LAKE LEVEL 3 is located at 201 Arrowhead Ln, Moose Lake, MN.
What kind of charging does MOOSE LAKE LEVEL 3 offer?
MOOSE LAKE LEVEL 3 offers DC fast charging, with stations rated up to 50 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at MOOSE LAKE LEVEL 3?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging at MOOSE LAKE LEVEL 3. Actual times vary with vehicle, temperature, and station load.
What are MOOSE LAKE LEVEL 3's charging hours?
24 hours daily
What charging network operates MOOSE LAKE LEVEL 3?
MOOSE LAKE LEVEL 3 is part of the ChargePoint network. See more ChargePoint charging across MN on SpotCharge.
Can anyone use the chargers at MOOSE LAKE LEVEL 3?
Yes — MOOSE LAKE LEVEL 3 is a publicly accessible charging location.
Is the MOOSE LAKE LEVEL 3 listing owner-managed?
Not yet. This page was generated from open charging data (OpenChargeMap, NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Minnesota · 2024
Plug-in vehicles
68K
#21 in US
Battery-electric
47K
70% of fleet
EVs per public port
19.7
3,428 ports listed

As of 2024, Minnesota had 67,500 plug-in vehicles registered — 47,400 fully battery-electric (70%) and 20,100 plug-in hybrid (30%). That ranks Minnesota #21 nationally and represents about 1.1% of all US plug-in registrations.

Across 3,428 publicly-listed ports in Minnesota (1,970 Level 2 and 1,447 DC fast), that works out to roughly 19.7 EVs per public port and 32.8 BEVs per DC fast port.

Minnesota has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Minnesota drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Minnesota market data →

More DC fast charging

DC fast charging in Moose Lake →DC fast charging in Minnesota →ChargePoint in Minnesota →

More charging in Moose Lake

See all →

Kwik Trip #166

Moose Lake, MN

DC FastKwik Charge
2 stations · 8 ports400 kW

Moose Lake Water&Light

Moose Lake, MN

DC FastNayax Energy
1 station · 2 ports50 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 5 days ago

Data from OpenChargeMap, NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id144220
zip55767
cityMoose Lake
plus4—
stateMN
ng_psi—
cng_psi—
countryUS
latitude46.452592
bd_blends—
longitude-92.763636
open_date2019-08-30
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-15T01:26:55Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameMOOSE LAKE LEVEL 3
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "2234681"
  ],
  "station": [
    "USCPIL1894571"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address201 Arrowhead Ln
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 50,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 50,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-15
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
OpenChargeMap13 fields▾

From OpenChargeMap · CC-BY-SA 4.0

ID145072
UUID3596C594-4FCB-49D3-B868-C1567BDCF510
OperatorID5
AddressInfo
{
  "ID": 145424,
  "Town": "Moose Lake",
  "Title": "MOOSE LAKE LEVEL 3",
  "Latitude": 46.452592,
  "Postcode": "55767",
  "CountryID": 2,
  "Longitude": -92.763636,
  "RelatedURL": "http://www.chargepoint.com/",
  "AddressLine1": "201 Arrowhead Ln",
  "DistanceUnit": 0,
  "AccessComments": "24 hours daily",
  "StateOrProvince": "MN",
  "ContactTelephone1": "888-758-4389"
}
Connections
[
  {
    "ID": 201664,
    "LevelID": 3,
    "PowerKW": 50,
    "Comments": "",
    "Quantity": 1,
    "CurrentTypeID": 30,
    "ConnectionTypeID": 2
  },
  {
    "ID": 201665,
    "LevelID": 3,
    "PowerKW": 50,
    "Comments": "",
    "Quantity": 1,
    "CurrentTypeID": 30,
    "ConnectionTypeID": 32
  }
]
DateCreated2019-12-24T09:24:00Z
UsageTypeID1
OperatorInfo
{
  "ID": 5,
  "Title": "ChargePoint",
  "Comments": "GB*CPI,AT*HTB",
  "BookingURL": null,
  "WebsiteURL": "http://www.chargepoint.net/",
  "AddressInfo": null,
  "ContactEmail": null,
  "FaultReportEmail": null,
  "IsRestrictedEdit": false,
  "IsPrivateIndividual": false,
  "PhonePrimaryContact": "1-408-841-4500",
  "PhoneSecondaryContact": null
}
StatusTypeID50
DataProviderID1
DateLastVerified2024-03-04T12:59:00Z
DateLastStatusUpdate2024-03-04T12:59:00Z
SubmissionStatusTypeID100
SpotCharge · Data via OpenChargeMap