SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMinnesotaShoreview
MN-027045

Edison at Rice Creek Phase 4

5901 Rice Creek Pkwy, Shoreview, MN, 55126

Edison at Rice Creek Phase 4 is an EV charging location in Shoreview, MN with 2 Level 2 charging ports on the AmpUp network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. By appointment. Listing data from NREL, last refreshed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2023
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
2
ports
Hours
—
Pricing
—

Stations & ports

1 station · 2 ports
Edison at Rice Creek Phase 4 · L2 J1772
AMPUP
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

Start session on AMPUP network →
1AJ1772
1BJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

5901 Rice Creek Pkwy · Shoreview, MN · 55126

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Edison at Rice Creek Phase 4 located?
Edison at Rice Creek Phase 4 is located at 5901 Rice Creek Pkwy, Shoreview, MN.
What kind of charging does Edison at Rice Creek Phase 4 offer?
Edison at Rice Creek Phase 4 offers Level 2 (AC) charging. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Edison at Rice Creek Phase 4?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at Edison at Rice Creek Phase 4. Actual times vary with vehicle, temperature, and station load.
What charging network operates Edison at Rice Creek Phase 4?
Edison at Rice Creek Phase 4 is part of the AmpUp network. See more AmpUp charging across MN on SpotCharge.
Can anyone use the chargers at Edison at Rice Creek Phase 4?
Edison at Rice Creek Phase 4 is listed as by appointment access — check the details before visiting.
How do you pay for charging at Edison at Rice Creek Phase 4?
Edison at Rice Creek Phase 4 accepts Mastercard, American Express, Discover, Apple Pay and Google Pay, according to NREL.
Is the Edison at Rice Creek Phase 4 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Minnesota · 2024
Plug-in vehicles
68K
#21 in US
Battery-electric
47K
70% of fleet
EVs per public port
19.7
3,428 ports listed

As of 2024, Minnesota had 67,500 plug-in vehicles registered — 47,400 fully battery-electric (70%) and 20,100 plug-in hybrid (30%). That ranks Minnesota #21 nationally and represents about 1.1% of all US plug-in registrations.

Across 3,428 publicly-listed ports in Minnesota (1,970 Level 2 and 1,447 DC fast), that works out to roughly 19.7 EVs per public port and 32.8 BEVs per DC fast port.

Minnesota has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Minnesota drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Minnesota market data →

More charging in Shoreview

See all →

SHOREVIEW BOBBY-THEISEN

Shoreview, MN

Level 2ChargePoint
2 stations · 4 ports9.6 kW

SHOREVIEW SHOREVIEW #1

Shoreview, MN

Level 2ChargePoint
1 station · 2 ports6.5 kW

SHOREVIEW SHOREVIEW #2

Shoreview, MN

Level 2ChargePoint
1 station · 2 ports6.5 kW

Hilton Garden Inn Minneapolis St. Paul-Shoreview

Shoreview, MN

Level 2Tesla Destination
1 station · 4 ports16 kW
Details
Network
AmpUp ↗
Access
By appointment
Payment
Mastercard, American Express, Discover, Apple Pay, Google Pay
From NREL
Ownership
Privately owned
From NREL

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id319474
zip55126
cityShoreview
plus4—
stateMN
ng_psi—
cng_psi—
countryUS
latitude45.1189573
bd_blends—
longitude-93.1868802
open_date2023-09-18
rd_blends—
ev_networkAMPUP
ev_pricing—
updated_at2024-01-31T22:07:01Z
access_codeprivate
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameEdison at Rice Creek Phase 4
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone—
cards_acceptedA ANDROID_PAY APPLE_PAY CREDIT D M
ev_dc_fast_num—
ev_network_webhttps://ampup.io
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address5901 Rice Creek Pkwy
funding_sources—
owner_type_codeP
access_days_timeContact site for information
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "AMPUP",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "AMPUP",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_access—
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2023-12-13
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePrivate
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPrivé
intersection_directions_fr—
SpotCharge · Owner-listed EV charging