SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMinnesotaStillwater
MN-024400

GOVERNMENT CEN GOV CTR 1

14949 62nd Street North, Stillwater, MN, 55082
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
GOVERNMENT CEN GOV CTR 1 · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

14949 62nd Street North · Stillwater, MN · 55082

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is GOVERNMENT CEN GOV CTR 1 located?
GOVERNMENT CEN GOV CTR 1 is located at 14949 62nd Street North, Stillwater, MN.
What kind of charging does GOVERNMENT CEN GOV CTR 1 offer?
GOVERNMENT CEN GOV CTR 1 offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at GOVERNMENT CEN GOV CTR 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at GOVERNMENT CEN GOV CTR 1. Actual times vary with vehicle, temperature, and station load.
What are GOVERNMENT CEN GOV CTR 1's charging hours?
Open 24 hours
What charging network operates GOVERNMENT CEN GOV CTR 1?
GOVERNMENT CEN GOV CTR 1 is part of the ChargePoint Network network. See more ChargePoint Network charging across MN on SpotCharge.
Can anyone use the chargers at GOVERNMENT CEN GOV CTR 1?
Yes — GOVERNMENT CEN GOV CTR 1 is a publicly accessible charging location.
Is the GOVERNMENT CEN GOV CTR 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Minnesota · 2024
Plug-in vehicles
68K
#21 in US
Battery-electric
47K
70% of fleet
EVs per public port
22.2
3,046 ports listed

As of 2024, Minnesota had 67,500 plug-in vehicles registered — 47,400 fully battery-electric (70%) and 20,100 plug-in hybrid (30%). That ranks Minnesota #21 nationally and represents about 1.1% of all US plug-in registrations.

Across 3,046 publicly-listed ports in Minnesota (1,770 Level 2 and 1,265 DC fast), that works out to roughly 22.2 EVs per public port and 37.5 BEVs per DC fast port.

Minnesota's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Minnesota market data →

More charging in Stillwater

See all →

O'Neill Electric Inc

Stillwater, MN

Level 2AMPUP
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging