SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMichiganKalamazoo
MI-974016

SEELYE SEELYE FAST

3820 Stadium Drive, Kalamazoo, MI, 49008

SEELYE SEELYE FAST is an EV charging location in Kalamazoo, MI with 2 DC fast charging ports up to 120 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2025
Max power
120 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • East side of Ford

    Source · NREL

Stations & ports

1 station · 2 ports
SEELYE SEELYE FAST · DCFC CCS 120 kW
ChargePoint Network
DC fast · 120 kW

120 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACCS· 120 kW
1BCCS· 120 kW

Estimated charging time

DC fast charging · 120 kW
~29 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

3820 Stadium Drive · Kalamazoo, MI · 49008

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is SEELYE SEELYE FAST located?
SEELYE SEELYE FAST is located at 3820 Stadium Drive, Kalamazoo, MI.
What kind of charging does SEELYE SEELYE FAST offer?
SEELYE SEELYE FAST offers DC fast charging, with stations rated up to 120 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at SEELYE SEELYE FAST?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 29 min on 120 kW DC fast charging at SEELYE SEELYE FAST. Actual times vary with vehicle, temperature, and station load.
What are SEELYE SEELYE FAST's charging hours?
24 hours daily
What charging network operates SEELYE SEELYE FAST?
SEELYE SEELYE FAST is part of the ChargePoint network. See more ChargePoint charging across MI on SpotCharge.
Can anyone use the chargers at SEELYE SEELYE FAST?
Yes — SEELYE SEELYE FAST is a publicly accessible charging location.
Is the SEELYE SEELYE FAST listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Michigan · 2024
Plug-in vehicles
109K
#17 in US
Battery-electric
76K
69% of fleet
EVs per public port
18.5
5,922 ports listed

As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.

Across 5,922 publicly-listed ports in Michigan (3,454 Level 2 and 2,445 DC fast), that works out to roughly 18.5 EVs per public port and 31 BEVs per DC fast port.

Michigan has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Michigan drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →

More DC fast charging

DC fast charging in Kalamazoo →DC fast charging in Michigan →ChargePoint in Michigan →

More charging in Kalamazoo

See all →

Stan Ouding Bedding Plants - Tesla Destination

Kalamazoo, MI

Level 2Tesla Destination
2 stations · 8 ports10 kW

Tru / Home Suites by Hilton - Tesla Destination

Kalamazoo, MI

Level 2Tesla Destination
2 stations · 4 ports

Kendall Off Main

Kalamazoo, MI

Level 2Flipturn
2 stations · 8 ports19.2 kW

Clayborn Flatz

Kalamazoo, MI

Level 2Flipturn
1 station · 10 ports12.5 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 6 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id422068
zip49008
cityKalamazoo
plus4—
stateMI
ng_psi—
cng_psi—
countryUS
latitude42.27188
bd_blends—
longitude-85.636915
open_date2025-09-11
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-14T03:01:42Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameSEELYE SEELYE FAST
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num2
ev_network_ids
{
  "posts": [
    "27957111",
    "27957121"
  ],
  "station": [
    "USCPIL17940511"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address3820 Stadium Drive
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 120,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 120,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-14
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsEast side of Ford
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging