SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMichiganSouth Lyon
MI-844066

SLDCC Building

21800 Pontiac Trail, South Lyon, MI, 48178
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Public
Max power
7.2 kW
AC Level 2
Ports
4
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 4 ports
SLDCC Building · L2 J1772
RED_E
AC L2 · 7.2 kW
Start session on RED_E network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

21800 Pontiac Trail · South Lyon, MI · 48178

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is SLDCC Building located?
SLDCC Building is located at 21800 Pontiac Trail, South Lyon, MI.
What kind of charging does SLDCC Building offer?
SLDCC Building offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 4 total ports at this location.
How long does it take to charge an EV at SLDCC Building?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at SLDCC Building. Actual times vary with vehicle, temperature, and station load.
What are SLDCC Building's charging hours?
Open 24 hours
What charging network operates SLDCC Building?
SLDCC Building is part of the RED_E network. See more RED_E charging across MI on SpotCharge.
Can anyone use the chargers at SLDCC Building?
Yes — SLDCC Building is a publicly accessible charging location.
Is the SLDCC Building listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Michigan · 2024
Plug-in vehicles
109K
#17 in US
Battery-electric
76K
69% of fleet
EVs per public port
20.5
5,340 ports listed

As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.

Across 5,340 publicly-listed ports in Michigan (3,101 Level 2 and 2,216 DC fast), that works out to roughly 20.5 EVs per public port and 34.2 BEVs per DC fast port.

Michigan's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →

Details
Hours
Open 24 hours
Phone
313-262-6722
Network
RED_E ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging