SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMichiganClinton Township
MI-813151

Moran Chevrolet Clinton Township

35500 South Gratiot Ave, Clinton Township, MI, 48035
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
50 kW
DC fast
Ports
10
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

2 stations · 10 ports
Moran Chevrolet Clinton Township · L2 J1772
EV Connect
AC L2 · 7.2 kW
Start session on EV Connect network →
1AJ1772· 7.2 kW· 240V/30A
Moran Chevrolet Clinton Township · DCFC CCS
EV Connect
DC fast · 50 kW
Start session on EV Connect network →
2ACCS· 50 kW· 480V/100A
2BCCS· 50 kW· 480V/100A
2CCCS· 50 kW· 480V/100A
2DCCS· 50 kW· 480V/100A
2ECCS· 50 kW· 480V/100A
2FCCS· 50 kW· 480V/100A
2GCCS· 50 kW· 480V/100A
2HCCS· 50 kW· 480V/100A
2ICCS· 50 kW· 480V/100A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min
Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

35500 South Gratiot Ave · Clinton Township, MI · 48035

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Moran Chevrolet Clinton Township located?
Moran Chevrolet Clinton Township is located at 35500 South Gratiot Ave, Clinton Township, MI.
What kind of charging does Moran Chevrolet Clinton Township offer?
Moran Chevrolet Clinton Township offers DC fast charging and Level 2 (AC) charging, with stations rated up to 50 kW. There are 2 charging stations and 10 total ports at this location.
How long does it take to charge an EV at Moran Chevrolet Clinton Township?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging, or about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Moran Chevrolet Clinton Township. Actual times vary with vehicle, temperature, and station load.
What are Moran Chevrolet Clinton Township's charging hours?
Open 24 hours
What charging network operates Moran Chevrolet Clinton Township?
Moran Chevrolet Clinton Township is part of the EV Connect network. See more EV Connect charging across MI on SpotCharge.
Can anyone use the chargers at Moran Chevrolet Clinton Township?
Yes — Moran Chevrolet Clinton Township is a publicly accessible charging location.
Is the Moran Chevrolet Clinton Township listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Michigan · 2024
Plug-in vehicles
109K
#17 in US
Battery-electric
76K
69% of fleet
EVs per public port
20.5
5,340 ports listed

As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.

Across 5,340 publicly-listed ports in Michigan (3,101 Level 2 and 2,216 DC fast), that works out to roughly 20.5 EVs per public port and 34.2 BEVs per DC fast port.

Michigan's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →

More charging in Clinton Township

See all →

FasCharge 8245 Clinton Township

Clinton Township, MI

DC FastRED_E
2 stations · 4 ports50 kW

Macomb Community College (Center Campus, Lot 4, near Cultural Ctr,)

Clinton Township, MI

Level 2FLO
1 station · 4 ports7.2 kW

Macomb Community College (Center Campus, Lot 5B)

Clinton Township, MI

Level 2FLO
1 station · 2 ports7.2 kW

Macomb Community College (Center Campus, Lot 11, N/R bldgs.)

Clinton Township, MI

Level 2FLO
1 station · 4 ports7.2 kW

Plan a trip around here

This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.

Metro Detroit →All Michigan destinations →
Details
Hours
Open 24 hours
Phone
866-816-7584
Network
EV Connect ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging