SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMichiganDearborn
MI-797428

Village Ford

23535 Michigan Ave, Dearborn, MI, 48124

Village Ford is a public in Dearborn, MI with 5 DC fast and Level 2 charging ports up to 180 kW on the Red E Charge network. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Public
📅Open since 2024
Max power
180 kW
DC fast
Ports
5
ports
Hours
—
Pricing
—

Stations & ports

2 stations · 5 ports
Village Ford · DCFC CCS 180 kW
RED_E
DC fast · 180 kW

180 kW can add 100 miles or more in 15 to 25 minutes, depending on the car.

Start session on RED_E network →
1ACCS· 180 kW
1BCCS· 180 kW
1CCCS· 180 kW
1DCCS· 180 kW
Village Ford · L2 J1772 19.2 kW
RED_E
AC L2 · 19.2 kW

19.2 kW adds roughly 65 miles of range per hour for a typical EV.

Start session on RED_E network →
2AJ1772· 19.2 kW

Estimated charging time

DC fast charging · 180 kW
~19 min
Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

23535 Michigan Ave · Dearborn, MI · 48124

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Village Ford located?
Village Ford is located at 23535 Michigan Ave, Dearborn, MI.
What kind of charging does Village Ford offer?
Village Ford offers DC fast charging and Level 2 (AC) charging, with stations rated up to 180 kW. There are 2 charging stations and 5 total ports at this location.
How long does it take to charge an EV at Village Ford?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 19 min on 180 kW DC fast charging, or about 5 h 18 min on 11 kW Level 2 (AC) charging at Village Ford. Actual times vary with vehicle, temperature, and station load.
What charging network operates Village Ford?
Village Ford is part of the Red E Charge network. See more Red E Charge charging across MI on SpotCharge.
Can anyone use the chargers at Village Ford?
Yes — Village Ford is a publicly accessible charging location.
Is the Village Ford listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Michigan · 2024
Plug-in vehicles
109K
#17 in US
Battery-electric
76K
69% of fleet
EVs per public port
18.5
5,922 ports listed

As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.

Across 5,922 publicly-listed ports in Michigan (3,454 Level 2 and 2,445 DC fast), that works out to roughly 18.5 EVs per public port and 31 BEVs per DC fast port.

Michigan has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Michigan drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →

More DC fast charging

DC fast charging in Dearborn →DC fast charging in Michigan →Red E Charge in Michigan →

More charging in Dearborn

See all →

AMC Dearborn - Outer

Dearborn, MI

Level 2PowerPump
1 station · 4 ports12 kW

Chillbox 9028 Michigan and Telegraph

Dearborn, MI

DC FastRed E Charge
1 station · 4 ports240 kW

J Mart Ford and Wyoming

Dearborn, MI

DC FastRed E Charge
1 station · 4 ports240 kW

University of Michigan - Dearborn - Fairlane Center North

Dearborn, MI

Level 2
1 station · 2 ports7 kW

Plan a trip around here

This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.

Metro Detroit →All Michigan destinations →
Details
Phone
313-262-6722
Network
Red E Charge ↗
Access
Public access

Verified by NREL · 6 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id400255
zip48124
cityDearborn
plus4—
stateMI
ng_psi—
cng_psi—
countryUS
latitude42.30094573494
bd_blends—
longitude-83.265178312
open_date2024-07-11
rd_blends—
ev_networkRED_E
ev_pricing—
updated_at2026-09-14T05:19:22Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameVillage Ford
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typePUBLIC
nps_unit_name—
station_phone313-262-6722
cards_accepted—
ev_dc_fast_num4
ev_network_ids
{
  "posts": [
    "1769*1",
    "1769*2",
    "1770*1",
    "1770*2",
    "1772"
  ],
  "station": [
    "447"
  ]
}
ev_network_webhttps://www.redecharge.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address23535 Michigan Ave
funding_sources—
owner_type_code—
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "RED_E",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 180,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "RED_E",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 180,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "RED_E",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "RED_E",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 180,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "RED_E",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 180,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num1
access_days_time_fr—
date_last_confirmed2026-09-14
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging