SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMichiganSterling Heights
MI-721098

Ford Motor Sterling Plant -TCO5A - 2

39000 Mound Rd, Sterling Heights, MI, 48310
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Factory
Max power
7.2 kW
AC Level 2
Ports
14
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 14 ports
Ford Motor Sterling Plant -TCO5A - 2 · L2 J1772
AMPUP
AC L2 · 7.2 kW
Start session on AMPUP network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A
1EJ1772· 7.2 kW· 240V/30A
1FJ1772· 7.2 kW· 240V/30A
1GJ1772· 7.2 kW· 240V/30A
1HJ1772· 7.2 kW· 240V/30A
1IJ1772· 7.2 kW· 240V/30A
1JJ1772· 7.2 kW· 240V/30A
1KJ1772· 7.2 kW· 240V/30A
1LJ1772· 7.2 kW· 240V/30A
1MJ1772· 7.2 kW· 240V/30A
1NJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

39000 Mound Rd · Sterling Heights, MI · 48310

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Ford Motor Sterling Plant -TCO5A - 2 located?
Ford Motor Sterling Plant -TCO5A - 2 is located at 39000 Mound Rd, Sterling Heights, MI.
What kind of charging does Ford Motor Sterling Plant -TCO5A - 2 offer?
Ford Motor Sterling Plant -TCO5A - 2 offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 14 total ports at this location.
How long does it take to charge an EV at Ford Motor Sterling Plant -TCO5A - 2?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Ford Motor Sterling Plant -TCO5A - 2. Actual times vary with vehicle, temperature, and station load.
What are Ford Motor Sterling Plant -TCO5A - 2's charging hours?
Open 24 hours
What charging network operates Ford Motor Sterling Plant -TCO5A - 2?
Ford Motor Sterling Plant -TCO5A - 2 is part of the AMPUP network. See more AMPUP charging across MI on SpotCharge.
Can anyone use the chargers at Ford Motor Sterling Plant -TCO5A - 2?
Ford Motor Sterling Plant -TCO5A - 2 is listed as by appointment access — check the details before visiting.
Is the Ford Motor Sterling Plant -TCO5A - 2 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Michigan · 2024
Plug-in vehicles
109K
#17 in US
Battery-electric
76K
69% of fleet
EVs per public port
20.5
5,340 ports listed

As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.

Across 5,340 publicly-listed ports in Michigan (3,101 Level 2 and 2,216 DC fast), that works out to roughly 20.5 EVs per public port and 34.2 BEVs per DC fast port.

Michigan's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →

More charging in Sterling Heights

See all →

Destination Napa Sterling Heights

Sterling Heights, MI

Level 2EVGATEWAY
1 station · 2 ports7.2 kW

ARNOLD ARNOLD 1ICC 1

Sterling Heights, MI

Level 2ChargePoint Network
1 station · 1 port7.2 kW

ARNOLD ARNOLD IICC 2

Sterling Heights, MI

Level 2ChargePoint Network
1 station · 1 port7.2 kW

L419 CP6K-3

Sterling Heights, MI

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

Plan a trip around here

This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.

Metro Detroit →All Michigan destinations →
Details
Hours
Open 24 hours
Network
AMPUP ↗
Access
By appointment

Data from NREL

SpotCharge · Owner-listed EV charging