SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMichiganAllegan
MI-716833

Cutler St Lot Allegan MI

101 Cutler St, Allegan, MI, 49010
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Public
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
Cutler St Lot Allegan MI · L2 J1772
RED_E
AC L2 · 7.2 kW
Start session on RED_E network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

101 Cutler St · Allegan, MI · 49010

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Cutler St Lot Allegan MI located?
Cutler St Lot Allegan MI is located at 101 Cutler St, Allegan, MI.
What kind of charging does Cutler St Lot Allegan MI offer?
Cutler St Lot Allegan MI offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Cutler St Lot Allegan MI?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Cutler St Lot Allegan MI. Actual times vary with vehicle, temperature, and station load.
What are Cutler St Lot Allegan MI's charging hours?
Open 24 hours
What charging network operates Cutler St Lot Allegan MI?
Cutler St Lot Allegan MI is part of the RED_E network. See more RED_E charging across MI on SpotCharge.
Can anyone use the chargers at Cutler St Lot Allegan MI?
Yes — Cutler St Lot Allegan MI is a publicly accessible charging location.
Is the Cutler St Lot Allegan MI listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Michigan · 2024
Plug-in vehicles
109K
#17 in US
Battery-electric
76K
69% of fleet
EVs per public port
20.5
5,340 ports listed

As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.

Across 5,340 publicly-listed ports in Michigan (3,101 Level 2 and 2,216 DC fast), that works out to roughly 20.5 EVs per public port and 34.2 BEVs per DC fast port.

Michigan's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →

More charging in Allegan

See all →

PERRIGOPMI STATION 2 PL4

Allegan, MI

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

PERRIGOPMI STATION 1 EAOE

Allegan, MI

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

Allegan General Hospital

Allegan, MI

Level 2Non-Networked
1 station · 6 ports7.2 kW
Details
Hours
Open 24 hours
Phone
313-262-6722
Network
RED_E ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging