SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMichiganTawas City
MI-706795

Tawas City Shoreline Park

501 W Lake St, Tawas City, MI, 48763
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🌳Park
Max power
7.2 kW
AC Level 2
Ports
1
port
Hours
24/7
Open 24 hours
Pricing
Free
Free

Stations & ports

1 station · 1 port
Tawas City Shoreline Park · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

501 W Lake St · Tawas City, MI · 48763

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Tawas City Shoreline Park located?
Tawas City Shoreline Park is located at 501 W Lake St, Tawas City, MI.
What kind of charging does Tawas City Shoreline Park offer?
Tawas City Shoreline Park offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at Tawas City Shoreline Park?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Tawas City Shoreline Park. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Tawas City Shoreline Park?
Free
What are Tawas City Shoreline Park's charging hours?
Open 24 hours
What charging network operates Tawas City Shoreline Park?
Tawas City Shoreline Park is part of the Non-Networked network. See more Non-Networked charging across MI on SpotCharge.
Can anyone use the chargers at Tawas City Shoreline Park?
Yes — Tawas City Shoreline Park is a publicly accessible charging location.
Is the Tawas City Shoreline Park listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Michigan · 2024
Plug-in vehicles
109K
#17 in US
Battery-electric
76K
69% of fleet
EVs per public port
20.5
5,340 ports listed

As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.

Across 5,340 publicly-listed ports in Michigan (3,101 Level 2 and 2,216 DC fast), that works out to roughly 20.5 EVs per public port and 34.2 BEVs per DC fast port.

Michigan's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →

More charging in Tawas City

See all →

Bay Inn Tawas MI

Tawas City, MI

Level 2RED_E
1 station · 2 ports7.2 kW

COYNE ENERGY N SHORE PARK 1

Tawas City, MI

DC FastChargePoint Network
2 stations · 2 ports50 kW

Tawas City Shore Park

Tawas City, MI

DC FastChargePoint
2 stations · 4 ports125 kW
Details
Hours
Open 24 hours
Pricing
Free
Phone
989-362-8688
Network
Non-Networked
Access
Public access

Last updated · 10 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging