SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMichiganHudsonville
MI-581158

Meijer 254 (Hudsonville, MI)

4075 32nd Ave, Hudsonville, MI, 49426

Meijer 254 (Hudsonville, MI) is an EV charging location in Hudsonville, MI with 6 DC fast charging ports up to 350 kW on the Electrify America network. Public access. Listing data from OpenChargeMap, last refreshed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
350 kW
DC fast
Ports
6
ports
Hours
—
Pricing
—

About this location

Located at Meijer

Stations & ports

1 station · 6 ports
Meijer 254 (Hudsonville, MI)
Electrify America
DC fast · 350 kW

350 kW can add 100 miles or more in 15 to 25 minutes, depending on the car.

1ACCS· 350 kW
1BCCS· 350 kW
1CCCS· 350 kW
1DCCS· 350 kW
1ECCS· 350 kW
1FCCS· 350 kW

Estimated charging time

DC fast charging · 350 kW
~10 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

4075 32nd Ave · Hudsonville, MI · 49426

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Meijer 254 (Hudsonville, MI) located?
Meijer 254 (Hudsonville, MI) is located at 4075 32nd Ave, Hudsonville, MI.
What kind of charging does Meijer 254 (Hudsonville, MI) offer?
Meijer 254 (Hudsonville, MI) offers DC fast charging, with stations rated up to 350 kW. There is 1 charging station and 6 total ports at this location.
How long does it take to charge an EV at Meijer 254 (Hudsonville, MI)?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 10 min on 350 kW DC fast charging at Meijer 254 (Hudsonville, MI). Actual times vary with vehicle, temperature, and station load.
What charging network operates Meijer 254 (Hudsonville, MI)?
Meijer 254 (Hudsonville, MI) is part of the Electrify America network. See more Electrify America charging across MI on SpotCharge.
Can anyone use the chargers at Meijer 254 (Hudsonville, MI)?
Yes — Meijer 254 (Hudsonville, MI) is a publicly accessible charging location.
Is the Meijer 254 (Hudsonville, MI) listing owner-managed?
Not yet. This page was generated from open charging data (OpenChargeMap) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Michigan · 2024
Plug-in vehicles
109K
#17 in US
Battery-electric
76K
69% of fleet
EVs per public port
18.5
5,927 ports listed

As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.

Across 5,927 publicly-listed ports in Michigan (3,457 Level 2 and 2,447 DC fast), that works out to roughly 18.5 EVs per public port and 31 BEVs per DC fast port.

Michigan has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Michigan drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →

More DC fast charging

DC fast charging in Hudsonville →DC fast charging in Michigan →Electrify America in Michigan →

More charging in Hudsonville

See all →

Prospect Flats

Hudsonville, MI

Level 2Red E Charge
1 station · 1 port12 kW

HUDSONVILLEPS HHS-FH-NORTH

Hudsonville, MI

Level 2ChargePoint
1 station · 2 ports6.5 kW

Todd Wenzel of Hudsonville

Hudsonville, MI

DC FastEV Connect
1 station · 2 ports180 kW

Meijer 254 (Hudsonville, MI)

Hudsonville, MI

DC FastElectrify America
1 station · 6 ports350 kW

Plan a trip around here

This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.

Grand Rapids →All Michigan destinations →
Details
Phone
833-632-2778
Network
Electrify America ↗
Access
Public access

Data from OpenChargeMap

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

OpenChargeMap14 fields▾

From OpenChargeMap · CC-BY-SA 4.0

ID270077
UUID1C868A58-431C-4907-9B91-80C88310F3B2
OperatorID3318
AddressInfo
{
  "ID": 270461,
  "Town": "Hudsonville",
  "Title": "Meijer 254 (Hudsonville, MI)",
  "Latitude": 42.84354,
  "Postcode": "49426",
  "CountryID": 2,
  "Longitude": -85.86462,
  "RelatedURL": "https://www.electrifyamerica.com/",
  "AddressLine1": "4075 32nd Ave",
  "DistanceUnit": 0,
  "AccessComments": "Located at Meijer",
  "StateOrProvince": "MI",
  "ContactTelephone1": "833-632-2778"
}
Connections
[
  {
    "ID": 459736,
    "LevelID": 3,
    "PowerKW": 350,
    "Comments": "",
    "Quantity": 6,
    "CurrentTypeID": 30,
    "ConnectionTypeID": 32
  }
]
DateCreated2023-07-04T07:29:00Z
UsageTypeID1
OperatorInfo
{
  "ID": 3318,
  "Title": "Electrify America",
  "Comments": null,
  "BookingURL": null,
  "WebsiteURL": "https://www.electrifyamerica.com/",
  "AddressInfo": null,
  "ContactEmail": null,
  "FaultReportEmail": null,
  "IsRestrictedEdit": false,
  "IsPrivateIndividual": false,
  "PhonePrimaryContact": null,
  "PhoneSecondaryContact": null
}
StatusTypeID50
DataProviderID1
NumberOfPoints6
DateLastVerified2024-01-30T04:17:00Z
DateLastStatusUpdate2024-01-30T04:17:00Z
SubmissionStatusTypeID100
SpotCharge · Data via OpenChargeMap