SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMichiganWayland
MI-459843

WINDEMULLER WAYLAND #2

1176 Electric Ave, Wayland, MI, 49348

WINDEMULLER WAYLAND #2 is an EV charging location in Wayland, MI with 2 DC fast charging ports up to 125 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2025
Max power
125 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 2 ports
WINDEMULLER WAYLAND #2 · DCFC CCS 125 kW
ChargePoint Network
DC fast · 125 kW

125 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACCS· 125 kW
WINDEMULLER WAYLAND #2 · DCFC CHAdeMO 125 kW
ChargePoint Network
DC fast · 125 kW

125 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
2ACHAdeMO· 125 kW

Estimated charging time

DC fast charging · 125 kW
~28 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1176 Electric Ave · Wayland, MI · 49348

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is WINDEMULLER WAYLAND #2 located?
WINDEMULLER WAYLAND #2 is located at 1176 Electric Ave, Wayland, MI.
What kind of charging does WINDEMULLER WAYLAND #2 offer?
WINDEMULLER WAYLAND #2 offers DC fast charging, with stations rated up to 125 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at WINDEMULLER WAYLAND #2?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 28 min on 125 kW DC fast charging at WINDEMULLER WAYLAND #2. Actual times vary with vehicle, temperature, and station load.
What are WINDEMULLER WAYLAND #2's charging hours?
24 hours daily
What charging network operates WINDEMULLER WAYLAND #2?
WINDEMULLER WAYLAND #2 is part of the ChargePoint network. See more ChargePoint charging across MI on SpotCharge.
Can anyone use the chargers at WINDEMULLER WAYLAND #2?
Yes — WINDEMULLER WAYLAND #2 is a publicly accessible charging location.
Is the WINDEMULLER WAYLAND #2 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Michigan · 2024
Plug-in vehicles
109K
#17 in US
Battery-electric
76K
69% of fleet
EVs per public port
18.5
5,922 ports listed

As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.

Across 5,922 publicly-listed ports in Michigan (3,454 Level 2 and 2,445 DC fast), that works out to roughly 18.5 EVs per public port and 31 BEVs per DC fast port.

Michigan has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Michigan drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →

More DC fast charging

DC fast charging in Wayland →DC fast charging in Michigan →ChargePoint in Michigan →

More charging in Wayland

See all →

1123 129th Avenue

Wayland, MI

Level 2ChargeLab
1 station · 14 ports12 kW

Great Lakes Energy - Wayland Service Center

Wayland, MI

Level 2OpConnect
1 station · 2 ports15.4 kW

Best Western Plus Wayland Hotel

Wayland, MI

Level 2
1 station · 1 port
Exxon

Exxon

Wayland, MI

DC Fast
2 stations · 4 ports200 kW

Plan a trip around here

This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.

Grand Rapids →All Michigan destinations →
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 6 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id440774
zip49348
cityWayland
plus4—
stateMI
ng_psi—
cng_psi—
countryUS
latitude42.76622
bd_blends—
longitude-85.661067
open_date2025-11-08
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-14T02:38:22Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameWINDEMULLER WAYLAND #2
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "25768981"
  ],
  "station": [
    "USCPIL16092571"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address1176 Electric Ave
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 125,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 125,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-14
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging