SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMichiganDetroit
MI-410881

Bagley Mobility Hub

1501 Wabash St, Detroit, MI, 48216
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Public
Max power
50 kW
DC fast
Ports
32
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

2 stations · 32 ports
Bagley Mobility Hub · DCFC CCS
RED_E
DC fast · 50 kW
Start session on RED_E network →
1ACCS· 50 kW· 480V/100A
1BCCS· 50 kW· 480V/100A
1CCCS· 50 kW· 480V/100A
1DCCS· 50 kW· 480V/100A
1ECCS· 50 kW· 480V/100A
1FCCS· 50 kW· 480V/100A
1GCCS· 50 kW· 480V/100A
1HCCS· 50 kW· 480V/100A
Bagley Mobility Hub · L2 J1772
RED_E
AC L2 · 7.2 kW
Start session on RED_E network →
2AJ1772· 7.2 kW· 240V/30A
2BJ1772· 7.2 kW· 240V/30A
2CJ1772· 7.2 kW· 240V/30A
2DJ1772· 7.2 kW· 240V/30A
2EJ1772· 7.2 kW· 240V/30A
2FJ1772· 7.2 kW· 240V/30A
2GJ1772· 7.2 kW· 240V/30A
2HJ1772· 7.2 kW· 240V/30A
2IJ1772· 7.2 kW· 240V/30A
2JJ1772· 7.2 kW· 240V/30A
2KJ1772· 7.2 kW· 240V/30A
2LJ1772· 7.2 kW· 240V/30A
2MJ1772· 7.2 kW· 240V/30A
2NJ1772· 7.2 kW· 240V/30A
2OJ1772· 7.2 kW· 240V/30A
2PJ1772· 7.2 kW· 240V/30A
2QJ1772· 7.2 kW· 240V/30A
2RJ1772· 7.2 kW· 240V/30A
2SJ1772· 7.2 kW· 240V/30A
2TJ1772· 7.2 kW· 240V/30A
2UJ1772· 7.2 kW· 240V/30A
2VJ1772· 7.2 kW· 240V/30A
2WJ1772· 7.2 kW· 240V/30A
2XJ1772· 7.2 kW· 240V/30A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min
Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1501 Wabash St · Detroit, MI · 48216

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Bagley Mobility Hub located?
Bagley Mobility Hub is located at 1501 Wabash St, Detroit, MI.
What kind of charging does Bagley Mobility Hub offer?
Bagley Mobility Hub offers DC fast charging and Level 2 (AC) charging, with stations rated up to 50 kW. There are 2 charging stations and 32 total ports at this location.
How long does it take to charge an EV at Bagley Mobility Hub?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging, or about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Bagley Mobility Hub. Actual times vary with vehicle, temperature, and station load.
What are Bagley Mobility Hub's charging hours?
Open 24 hours
What charging network operates Bagley Mobility Hub?
Bagley Mobility Hub is part of the RED_E network. See more RED_E charging across MI on SpotCharge.
Can anyone use the chargers at Bagley Mobility Hub?
Yes — Bagley Mobility Hub is a publicly accessible charging location.
Is the Bagley Mobility Hub listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Michigan · 2024
Plug-in vehicles
109K
#17 in US
Battery-electric
76K
69% of fleet
EVs per public port
20.5
5,340 ports listed

As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.

Across 5,340 publicly-listed ports in Michigan (3,101 Level 2 and 2,216 DC fast), that works out to roughly 20.5 EVs per public port and 34.2 BEVs per DC fast port.

Michigan's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →

More charging in Detroit

See all →

The Beauton Apartments

Detroit, MI

Level 2RED_E
1 station · 2 ports7.2 kW

HFHS SOUTH GARAGE 1K

Detroit, MI

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

BEDROCK HUD B1-2

Detroit, MI

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

BEDROCK HUB B2-10

Detroit, MI

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

Plan a trip around here

This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.

Metro Detroit →All Michigan destinations →
Details
Hours
Open 24 hours
Phone
313-262-6722
Network
RED_E ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging