Peterson Electric Services
Norway, MI
NORWAY MI DC FAST EV 1 is an EV charging location in Norway, MI with 2 DC fast charging ports up to 63 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.
62.5 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.
Start session on ChargePoint Network network →62 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.
Start session on ChargePoint Network network →For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →
No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.
Charged here? Tell the next driver how it went:
No reviews yet — be the first to charge here and share your experience.
As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.
Every EV registered in Michigan is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.
Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →
Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.
From U.S. DOE AFDC · Public domain
| id | 171195 |
|---|---|
| zip | 49870 |
| city | Norway |
| plus4 | — |
| state | MI |
| ng_psi | — |
| cng_psi | — |
| country | US |
| latitude | 45.786255 |
| bd_blends | — |
| longitude | -87.907667 |
| open_date | 2021-01-08 |
| rd_blends | — |
| ev_network | ChargePoint Network |
| ev_pricing | — |
| updated_at | 2026-09-16T01:45:28Z |
| access_code | public |
| cng_has_rng | — |
| lng_has_rng | — |
| lpg_primary | — |
| status_code | E |
| bd_blends_fr | — |
| hy_is_retail | — |
| hy_pressures | — |
| hy_standards | — |
| rd_blends_fr | — |
| station_name | NORWAY MI DC FAST EV 1 |
| ev_other_evse | — |
| ev_pricing_fr | — |
| expected_date | — |
| facility_type | — |
| nps_unit_name | — |
| station_phone | 888-758-4389 |
| cards_accepted | — |
| ev_dc_fast_num | 1 |
| ev_network_ids | {
"posts": [
"9228071"
],
"station": [
"USCPIL5584321"
]
} |
| ev_network_web | https://www.chargepoint.com |
| fuel_type_code | ELEC |
| geocode_status | GPS |
| hy_status_link | — |
| street_address | 615 Main St |
| funding_sources | — |
| owner_type_code | — |
| access_days_time | 24 hours daily |
| e85_blender_pump | — |
| lpg_nozzle_types | — |
| ng_vehicle_class | — |
| related_stations | — |
| cng_dispenser_num | — |
| cng_total_storage | — |
| cng_vehicle_class | — |
| ev_charging_units | [
{
"network": "ChargePoint Network",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 0
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": 62.5,
"port_count": 1
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": 62,
"port_count": 1
}
},
"port_count": 1,
"charging_level": "dc_fast",
"funding_sources": []
}
] |
| lng_vehicle_class | — |
| ng_fill_type_code | — |
| restricted_access | No |
| access_detail_code | — |
| cng_fill_type_code | — |
| ev_connector_types | CHADEMO, J1772COMBO |
| ev_level1_evse_num | — |
| ev_level2_evse_num | — |
| access_days_time_fr | — |
| date_last_confirmed | 2026-09-16 |
| ev_renewable_source | — |
| cng_renewable_source | — |
| lng_renewable_source | — |
| cng_total_compression | — |
| ev_workplace_charging | No |
| maximum_vehicle_class | — |
| rd_max_biodiesel_level | — |
| groups_with_access_code | Public |
| intersection_directions | — |
| e85_other_ethanol_blends | — |
| rd_blended_with_biodiesel | — |
| groups_with_access_code_fr | Public |
| intersection_directions_fr | — |