SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMichiganRichmond
MI-337641

DICK HUVAERE'S POWER LINK 1

67567 Main St, Richmond, MI, 48062
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
50 kW
DC fast
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

2 stations · 2 ports
DICK HUVAERE'S POWER LINK 1 · DCFC CCS
ChargePoint Network
DC fast · 50 kW
Start session on ChargePoint Network network →
1ACCS· 50 kW· 480V/100A
DICK HUVAERE'S POWER LINK 1 · DCFC CHAdeMO
ChargePoint Network
DC fast · 50 kW
Start session on ChargePoint Network network →
2ACHAdeMO· 50 kW· 480V/100A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

67567 Main St · Richmond, MI · 48062

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is DICK HUVAERE'S POWER LINK 1 located?
DICK HUVAERE'S POWER LINK 1 is located at 67567 Main St, Richmond, MI.
What kind of charging does DICK HUVAERE'S POWER LINK 1 offer?
DICK HUVAERE'S POWER LINK 1 offers DC fast charging, with stations rated up to 50 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at DICK HUVAERE'S POWER LINK 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging at DICK HUVAERE'S POWER LINK 1. Actual times vary with vehicle, temperature, and station load.
What are DICK HUVAERE'S POWER LINK 1's charging hours?
Open 24 hours
What charging network operates DICK HUVAERE'S POWER LINK 1?
DICK HUVAERE'S POWER LINK 1 is part of the ChargePoint Network network. See more ChargePoint Network charging across MI on SpotCharge.
Can anyone use the chargers at DICK HUVAERE'S POWER LINK 1?
Yes — DICK HUVAERE'S POWER LINK 1 is a publicly accessible charging location.
Is the DICK HUVAERE'S POWER LINK 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Michigan · 2024
Plug-in vehicles
109K
#17 in US
Battery-electric
76K
69% of fleet
EVs per public port
20.5
5,340 ports listed

As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.

Across 5,340 publicly-listed ports in Michigan (3,101 Level 2 and 2,216 DC fast), that works out to roughly 20.5 EVs per public port and 34.2 BEVs per DC fast port.

Michigan's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →

More charging in Richmond

See all →

DICK HUVAERE'S PARK

Richmond, MI

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

DICK HUVAERE'S CHARGER #5

Richmond, MI

Level 2ChargePoint Network
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging