SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMichiganNewaygo
MI-217378

Great Lakes Energy - Newaygo Service Center

1 Cooperative Center Dr., Newaygo, MI, 49337
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
Great Lakes Energy - Newaygo Service Center · L2 J1772
OpConnect
AC L2 · 7.2 kW
Start session on OpConnect network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1 Cooperative Center Dr. · Newaygo, MI · 49337

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Great Lakes Energy - Newaygo Service Center located?
Great Lakes Energy - Newaygo Service Center is located at 1 Cooperative Center Dr., Newaygo, MI.
What kind of charging does Great Lakes Energy - Newaygo Service Center offer?
Great Lakes Energy - Newaygo Service Center offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Great Lakes Energy - Newaygo Service Center?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Great Lakes Energy - Newaygo Service Center. Actual times vary with vehicle, temperature, and station load.
What are Great Lakes Energy - Newaygo Service Center's charging hours?
Open 24 hours
What charging network operates Great Lakes Energy - Newaygo Service Center?
Great Lakes Energy - Newaygo Service Center is part of the OpConnect network. See more OpConnect charging across MI on SpotCharge.
Can anyone use the chargers at Great Lakes Energy - Newaygo Service Center?
Yes — Great Lakes Energy - Newaygo Service Center is a publicly accessible charging location.
Is the Great Lakes Energy - Newaygo Service Center listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Michigan · 2024
Plug-in vehicles
109K
#17 in US
Battery-electric
76K
69% of fleet
EVs per public port
20.5
5,340 ports listed

As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.

Across 5,340 publicly-listed ports in Michigan (3,101 Level 2 and 2,216 DC fast), that works out to roughly 20.5 EVs per public port and 34.2 BEVs per DC fast port.

Michigan's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →

More charging in Newaygo

See all →

La Belle de la Riviere

Newaygo, MI

Level 2Tesla (Tesla-only charging)
1 station · 5 ports16 kW

La Belle de la Riviere - Tesla Destination

Newaygo, MI

Level 2Tesla Destination
1 station · 6 ports7.2 kW
Details
Hours
Open 24 hours
Phone
855-885-9571
Network
OpConnect ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging