Kirtland Community College Fleet Parking
Grayling, MI
Downtown Grayling Public Parking is a public in Grayling, MI with 2 DC fast charging ports up to 160 kW on the Red E Charge network. Public access. Listing data from OpenChargeMap and NREL, last confirmed November 2026.
160 kW can add 100 miles or more in 15 to 25 minutes, depending on the car.
For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →
No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.
Charged here? Tell the next driver how it went:
No reviews yet — be the first to charge here and share your experience.
As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.
Across 6,162 publicly-listed ports in Michigan (3,537 Level 2 and 2,602 DC fast), that works out to roughly 17.8 EVs per public port and 29.1 BEVs per DC fast port.
Michigan has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Michigan drivers switch to electric.
Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →
Grayling, MI
Grayling, MI
Grayling, MI
Grayling, MI
Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.
From U.S. DOE AFDC · Public domain
| id | 205171 |
|---|---|
| zip | 49738 |
| city | Grayling |
| plus4 | — |
| state | MI |
| ng_psi | — |
| cng_psi | — |
| country | US |
| latitude | 44.661989691087 |
| bd_blends | — |
| longitude | -84.715631992056 |
| open_date | 2021-01-18 |
| rd_blends | — |
| ev_network | RED_E |
| ev_pricing | — |
| unverified | No |
| updated_at | 2026-11-04T05:52:00Z |
| access_code | public |
| cng_has_rng | — |
| lng_has_rng | — |
| lpg_primary | — |
| status_code | E |
| bd_blends_fr | — |
| hy_is_retail | — |
| hy_pressures | — |
| hy_standards | — |
| rd_blends_fr | — |
| station_name | Grayling Public Parking |
| ev_other_evse | — |
| ev_pricing_fr | — |
| expected_date | — |
| facility_type | PUBLIC |
| nps_unit_name | — |
| station_phone | 313-262-6722 |
| cards_accepted | — |
| ev_dc_fast_num | 2 |
| ev_network_ids | {
"posts": [
"2082*1",
"2082*2"
],
"station": [
"172"
]
} |
| ev_network_web | https://www.redecharge.com |
| fuel_type_code | ELEC |
| geocode_status | GPS |
| hy_status_link | — |
| street_address | 403 Cedar St |
| funding_sources | — |
| owner_type_code | — |
| access_days_time | — |
| e85_blender_pump | — |
| lpg_nozzle_types | — |
| ng_vehicle_class | — |
| related_stations | — |
| cng_dispenser_num | — |
| cng_total_storage | — |
| cng_vehicle_class | — |
| ev_charging_units | [
{
"network": "RED_E",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 0
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": 160.3,
"port_count": 1
}
},
"port_count": 1,
"charging_level": "dc_fast",
"funding_sources": []
},
{
"network": "RED_E",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 0
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": 160.3,
"port_count": 1
}
},
"port_count": 1,
"charging_level": "dc_fast",
"funding_sources": []
}
] |
| lng_vehicle_class | — |
| ng_fill_type_code | — |
| restricted_access | No |
| access_detail_code | — |
| cng_fill_type_code | — |
| ev_connector_types | J1772COMBO |
| ev_level1_evse_num | — |
| ev_level2_evse_num | — |
| access_days_time_fr | — |
| date_last_confirmed | 2026-11-04 |
| ev_renewable_source | — |
| cng_renewable_source | — |
| lng_renewable_source | — |
| cng_total_compression | — |
| ev_workplace_charging | No |
| maximum_vehicle_class | — |
| rd_max_biodiesel_level | — |
| groups_with_access_code | Public |
| intersection_directions | — |
| e85_other_ethanol_blends | — |
| rd_blended_with_biodiesel | — |
| groups_with_access_code_fr | Public |
| intersection_directions_fr | — |
From OpenChargeMap · CC-BY-SA 4.0
| ID | 189391 |
|---|---|
| UUID | FB3C8512-9393-440E-87B6-B6725A47DCCC |
| MediaItems | [
{
"ID": 44320,
"User": {
"ID": 44742,
"Username": "MidwestEVAdventures"
},
"Comment": "",
"IsVideo": false,
"ItemURL": "https://media.openchargemap.io/images/US/OCM189391/OCM-189391.orig.2024112315381627.jpg",
"IsEnabled": true,
"DateCreated": "2024-11-23T15:38:00Z",
"ChargePointID": 189391,
"IsFeaturedItem": false,
"ItemThumbnailURL": "https://media.openchargemap.io/images/US/OCM189391/OCM-189391.thmb.2024112315381627.jpg",
"IsExternalResource": false
},
{
"ID": 36655,
"User": {
"ID": 44742,
"Username": "MidwestEVAdventures"
},
"Comment": "Three Tritium 50kW units by Red E Charging",
"IsVideo": false,
"ItemURL": "https://media.openchargemap.io/images/US/OCM189391/OCM-189391.orig.2023021701380784.jpg",
"IsEnabled": true,
"DateCreated": "2023-02-17T01:38:00Z",
"ChargePointID": 189391,
"IsFeaturedItem": false,
"ItemThumbnailURL": "https://media.openchargemap.io/images/US/OCM189391/OCM-189391.thmb.2023021701380784.jpg",
"IsExternalResource": false
}
] |
| OperatorID | 3696 |
| AddressInfo | {
"ID": 189750,
"Town": "Grayling",
"Title": "Downtown Grayling Public Parking",
"Latitude": 44.661851406632024,
"Postcode": "49738",
"CountryID": 2,
"Longitude": -84.71576102723752,
"RelatedURL": "http://redecharge.com",
"AddressLine1": "403 Cedar St",
"DistanceUnit": 0,
"StateOrProvince": "MI"
} |
| Connections | [
{
"ID": 306285,
"Amps": 300,
"LevelID": 3,
"PowerKW": 160,
"Voltage": 1000,
"Comments": "Site upgraded from 3 - 50kW units to single power share 160kW unit.",
"Quantity": 2,
"StatusTypeID": 50,
"CurrentTypeID": 30,
"ConnectionTypeID": 32
}
] |
| DateCreated | 2021-09-24T21:20:00Z |
| UsageTypeID | 1 |
| OperatorInfo | {
"ID": 3696,
"Title": "Red E Charge",
"Comments": null,
"BookingURL": null,
"WebsiteURL": "https://www.redecharge.com/",
"AddressInfo": null,
"ContactEmail": null,
"FaultReportEmail": null,
"IsRestrictedEdit": false,
"IsPrivateIndividual": false,
"PhonePrimaryContact": null,
"PhoneSecondaryContact": null
} |
| StatusTypeID | 50 |
| DataProviderID | 1 |
| NumberOfPoints | 2 |
| DateLastVerified | 2024-11-23T15:40:00Z |
| DateLastStatusUpdate | 2024-11-23T15:40:00Z |
| SubmissionStatusTypeID | 200 |