SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMichiganGrawn
MI-092253

CHERRYLAND_COOP CHERRYLAND EV1

5930 US-31, Grawn, MI, 49637

CHERRYLAND_COOP CHERRYLAND EV1 is an EV charging location in Grawn, MI with 2 Level 2 charging ports up to 7 kW on the ChargePoint network. Mon: 6:00am-8:00pm; Tue: 6:00am-8:00pm; Wed: 6:00am-8:00pm; Thu: 6:00am-8:00pm; Fri: 6:00am-8:00pm; Sat: 6:00am-8:00pm; Sun: 6:00am-8:00pm. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2021
Max power
6.5 kW
AC Level 2
Ports
2
ports
Hours
Hours
Mon: 6:00am-8:00pm; Tue: 6:00am-8:00pm; Wed: 6:00am-8:00pm; Thu: 6:00am-8:00pm; Fri: 6:00am-8:00pm; Sat: 6:00am-8:00pm; Sun: 6:00am-8:00pm
Pricing
—

Finding this location

  • Main parking lot

    Source · NREL

Stations & ports

1 station · 2 ports
CHERRYLAND_COOP CHERRYLAND EV1 · L2 J1772 6.5 kW
ChargePoint Network
AC L2 · 6.5 kW

6.5 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 6.5 kW
1BJ1772· 6.5 kW

Estimated charging time

Level 2 (AC) · 6.5 kW
~8 h 58 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

5930 US-31 · Grawn, MI · 49637

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is CHERRYLAND_COOP CHERRYLAND EV1 located?
CHERRYLAND_COOP CHERRYLAND EV1 is located at 5930 US-31, Grawn, MI.
What kind of charging does CHERRYLAND_COOP CHERRYLAND EV1 offer?
CHERRYLAND_COOP CHERRYLAND EV1 offers Level 2 (AC) charging, with stations rated up to 6.5 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at CHERRYLAND_COOP CHERRYLAND EV1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 58 min on 6.5 kW Level 2 (AC) charging at CHERRYLAND_COOP CHERRYLAND EV1. Actual times vary with vehicle, temperature, and station load.
What are CHERRYLAND_COOP CHERRYLAND EV1's charging hours?
Mon: 6:00am-8:00pm; Tue: 6:00am-8:00pm; Wed: 6:00am-8:00pm; Thu: 6:00am-8:00pm; Fri: 6:00am-8:00pm; Sat: 6:00am-8:00pm; Sun: 6:00am-8:00pm
What charging network operates CHERRYLAND_COOP CHERRYLAND EV1?
CHERRYLAND_COOP CHERRYLAND EV1 is part of the ChargePoint network. See more ChargePoint charging across MI on SpotCharge.
Can anyone use the chargers at CHERRYLAND_COOP CHERRYLAND EV1?
Yes — CHERRYLAND_COOP CHERRYLAND EV1 is a publicly accessible charging location.
Is the CHERRYLAND_COOP CHERRYLAND EV1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Michigan · 2024
Plug-in vehicles
109K
#17 in US
Battery-electric
76K
69% of fleet
EVs per public port
—
no port data

As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.

Every EV registered in Michigan is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →

More charging in Grawn

See all →

Cherryland Electric Cooperative - Tesla Destination

Grawn, MI

Level 2Tesla Destination
1 station · 1 port11 kW

Plan a trip around here

This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.

Leelanau Wine Country →All Michigan destinations →
Details
Hours
Mon: 6:00am-8:00pm; Tue: 6:00am-8:00pm; Wed: 6:00am-8:00pm; Thu: 6:00am-8:00pm; Fri: 6:00am-8:00pm; Sat: 6:00am-8:00pm; Sun: 6:00am-8:00pm
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 4 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id170981
zip49637
cityGrawn
plus4—
stateMI
ng_psi—
cng_psi—
countryUS
latitude44.665091
bd_blends—
longitude-85.694903
open_date2021-01-07
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-16T01:44:52Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameCHERRYLAND_COOP CHERRYLAND EV1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "25903821",
    "25903831"
  ],
  "station": [
    "USCPIL5560831"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address5930 US-31
funding_sources—
owner_type_code—
access_days_timeMon: 6:00am-8:00pm; Tue: 6:00am-8:00pm; Wed: 6:00am-8:00pm; Thu: 6:00am-8:00pm; Fri: 6:00am-8:00pm; Sat: 6:00am-8:00pm; Sun: 6:00am-8:00pm
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-16
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsMain parking lot
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging