SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMichiganFreeland
MI-041825

MBS EV SYSTEM MBS CP-02

9200 Garfield Road, Freeland, MI, 48623

MBS EV SYSTEM MBS CP-02 is an EV charging location in Freeland, MI with 2 Level 2 charging ports up to 19 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2026
Max power
19.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

1 station · 2 ports
MBS EV SYSTEM MBS CP-02 · L2 J1772 19.2 kW
ChargePoint Network
AC L2 · 19.2 kW

19.2 kW adds roughly 65 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 19.2 kW
1BJ1772· 19.2 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

9200 Garfield Road · Freeland, MI · 48623

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is MBS EV SYSTEM MBS CP-02 located?
MBS EV SYSTEM MBS CP-02 is located at 9200 Garfield Road, Freeland, MI.
What kind of charging does MBS EV SYSTEM MBS CP-02 offer?
MBS EV SYSTEM MBS CP-02 offers Level 2 (AC) charging, with stations rated up to 19.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at MBS EV SYSTEM MBS CP-02?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at MBS EV SYSTEM MBS CP-02. Actual times vary with vehicle, temperature, and station load.
What are MBS EV SYSTEM MBS CP-02's charging hours?
24 hours daily
What charging network operates MBS EV SYSTEM MBS CP-02?
MBS EV SYSTEM MBS CP-02 is part of the ChargePoint network. See more ChargePoint charging across MI on SpotCharge.
Can anyone use the chargers at MBS EV SYSTEM MBS CP-02?
Yes — MBS EV SYSTEM MBS CP-02 is a publicly accessible charging location.
Is the MBS EV SYSTEM MBS CP-02 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Michigan · 2024
Plug-in vehicles
109K
#17 in US
Battery-electric
76K
69% of fleet
EVs per public port
—
no port data

As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.

Every EV registered in Michigan is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →

More charging in Freeland

See all →

MBS EV SYSTEM EV 1 NORTH

Freeland, MI

DC FastChargePoint
2 stations · 2 ports62 kW

Burt Watson Chevrolet

Freeland, MI

DC FastLevel 2
2 stations · 3 ports24 kW

Pats Food Freeland

Freeland, MI

DC FastRed E Charge
1 station · 2 ports180 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 5 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id460622
zip48623
cityFreeland
plus4—
stateMI
ng_psi—
cng_psi—
countryUS
latitude43.538932
bd_blends—
longitude-84.08197
open_date2026-06-04
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-15T03:20:25Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameMBS EV SYSTEM MBS CP-02
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "31137131",
    "31137141"
  ],
  "station": [
    "USCPIL19864431"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address9200 Garfield Road
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-15
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging