SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMaineMadawaska
ME-956901

Town of Madawaska Public Parking & Park

309 Main St, Madawaska, ME, 04756
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
Town of Madawaska Public Parking & Park · L2 J1772
FLO
AC L2 · 7.2 kW
Start session on FLO network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

309 Main St · Madawaska, ME · 04756

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Town of Madawaska Public Parking & Park located?
Town of Madawaska Public Parking & Park is located at 309 Main St, Madawaska, ME.
What kind of charging does Town of Madawaska Public Parking & Park offer?
Town of Madawaska Public Parking & Park offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Town of Madawaska Public Parking & Park?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Town of Madawaska Public Parking & Park. Actual times vary with vehicle, temperature, and station load.
What are Town of Madawaska Public Parking & Park's charging hours?
Open 24 hours
What charging network operates Town of Madawaska Public Parking & Park?
Town of Madawaska Public Parking & Park is part of the FLO network. See more FLO charging across ME on SpotCharge.
Can anyone use the chargers at Town of Madawaska Public Parking & Park?
Yes — Town of Madawaska Public Parking & Park is a publicly accessible charging location.
Is the Town of Madawaska Public Parking & Park listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Maine · 2024
Plug-in vehicles
19K
#35 in US
Battery-electric
9.7K
51% of fleet
EVs per public port
12.2
1,550 ports listed

As of 2024, Maine had 18,900 plug-in vehicles registered — 9,700 fully battery-electric (51%) and 9,200 plug-in hybrid (49%). That ranks Maine #35 nationally and represents about 0.3% of all US plug-in registrations.

Across 1,550 publicly-listed ports in Maine (950 Level 2 and 600 DC fast), that works out to roughly 12.2 EVs per public port and 16.2 BEVs per DC fast port.

Maine has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Maine drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Maine market data →

Details
Hours
Open 24 hours
Phone
888-356-8911
Network
FLO ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging