SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMaineMilbridge
ME-644585

Downeast Community Partners

2 Maple St, Milbridge, ME, 04658
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🅿️Parking lot
Max power
7.2 kW
AC Level 2
Ports
3
ports
Hours
24/7
Open 24 hours
Pricing
Free
Free

Stations & ports

1 station · 3 ports
Downeast Community Partners · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2 Maple St · Milbridge, ME · 04658

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Downeast Community Partners located?
Downeast Community Partners is located at 2 Maple St, Milbridge, ME.
What kind of charging does Downeast Community Partners offer?
Downeast Community Partners offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 3 total ports at this location.
How long does it take to charge an EV at Downeast Community Partners?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Downeast Community Partners. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Downeast Community Partners?
Free
What are Downeast Community Partners's charging hours?
Open 24 hours
What charging network operates Downeast Community Partners?
Downeast Community Partners is part of the Non-Networked network. See more Non-Networked charging across ME on SpotCharge.
Can anyone use the chargers at Downeast Community Partners?
Yes — Downeast Community Partners is a publicly accessible charging location.
Is the Downeast Community Partners listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Maine · 2024
Plug-in vehicles
19K
#35 in US
Battery-electric
9.7K
51% of fleet
EVs per public port
12.2
1,550 ports listed

As of 2024, Maine had 18,900 plug-in vehicles registered — 9,700 fully battery-electric (51%) and 9,200 plug-in hybrid (49%). That ranks Maine #35 nationally and represents about 0.3% of all US plug-in registrations.

Across 1,550 publicly-listed ports in Maine (950 Level 2 and 600 DC fast), that works out to roughly 12.2 EVs per public port and 16.2 BEVs per DC fast port.

Maine has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Maine drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Maine market data →

Details
Hours
Open 24 hours
Pricing
Free
Phone
207-664-2424
Network
Non-Networked
Access
Public access

Last updated · 5 weeks ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging