CM MOTORS CM FORD is an EV charging location in Oakland, ME with 2 Level 2 charging ports up to 19 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.
Station is near NE corner of the building.
Source · NREL
19.2 kW adds roughly 65 miles of range per hour for a typical EV.
Start session on ChargePoint Network network →For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →
No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.
Charged here? Tell the next driver how it went:
No reviews yet — be the first to charge here and share your experience.
As of 2024, Maine had 18,900 plug-in vehicles registered — 9,700 fully battery-electric (51%) and 9,200 plug-in hybrid (49%). That ranks Maine #35 nationally and represents about 0.3% of all US plug-in registrations.
Across 2,065 publicly-listed ports in Maine (1,257 Level 2 and 808 DC fast), that works out to roughly 9.2 EVs per public port and 12 BEVs per DC fast port.
Maine has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Maine drivers switch to electric.
Source: AFDC (data from Experian Information Solutions) · See full Maine market data →
Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.
From U.S. DOE AFDC · Public domain
| id | 445874 |
|---|---|
| zip | 04963 |
| city | Oakland |
| plus4 | — |
| state | ME |
| ng_psi | — |
| cng_psi | — |
| country | US |
| latitude | 44.544966 |
| bd_blends | — |
| longitude | -69.684259 |
| open_date | 2025-11-18 |
| rd_blends | — |
| ev_network | ChargePoint Network |
| ev_pricing | — |
| updated_at | 2026-09-14T03:03:17Z |
| access_code | public |
| cng_has_rng | — |
| lng_has_rng | — |
| lpg_primary | — |
| status_code | E |
| bd_blends_fr | — |
| hy_is_retail | — |
| hy_pressures | — |
| hy_standards | — |
| rd_blends_fr | — |
| station_name | CM MOTORS CM FORD |
| ev_other_evse | — |
| ev_pricing_fr | — |
| expected_date | — |
| facility_type | — |
| nps_unit_name | — |
| station_phone | 888-758-4389 |
| cards_accepted | — |
| ev_dc_fast_num | — |
| ev_network_ids | {
"posts": [
"28131901",
"28131911"
],
"station": [
"USCPIL18091211"
]
} |
| ev_network_web | https://www.chargepoint.com |
| fuel_type_code | ELEC |
| geocode_status | GPS |
| hy_status_link | — |
| street_address | 801 Kennedy Memorial Drive |
| funding_sources | — |
| owner_type_code | — |
| access_days_time | 24 hours daily |
| e85_blender_pump | — |
| lpg_nozzle_types | — |
| ng_vehicle_class | — |
| related_stations | — |
| cng_dispenser_num | — |
| cng_total_storage | — |
| cng_vehicle_class | — |
| ev_charging_units | [
{
"network": "ChargePoint Network",
"connectors": {
"J1772": {
"power_kw": 19.2,
"port_count": 1
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": null,
"port_count": 0
}
},
"port_count": 1,
"charging_level": "2",
"funding_sources": []
},
{
"network": "ChargePoint Network",
"connectors": {
"J1772": {
"power_kw": 19.2,
"port_count": 1
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": null,
"port_count": 0
}
},
"port_count": 1,
"charging_level": "2",
"funding_sources": []
}
] |
| lng_vehicle_class | — |
| ng_fill_type_code | — |
| restricted_access | No |
| access_detail_code | — |
| cng_fill_type_code | — |
| ev_connector_types | J1772 |
| ev_level1_evse_num | — |
| ev_level2_evse_num | 2 |
| access_days_time_fr | — |
| date_last_confirmed | 2026-09-14 |
| ev_renewable_source | — |
| cng_renewable_source | — |
| lng_renewable_source | — |
| cng_total_compression | — |
| ev_workplace_charging | No |
| maximum_vehicle_class | — |
| rd_max_biodiesel_level | — |
| groups_with_access_code | Public |
| intersection_directions | Station is near NE corner of the building. |
| e85_other_ethanol_blends | — |
| rd_blended_with_biodiesel | — |
| groups_with_access_code_fr | Public |
| intersection_directions_fr | — |