SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMaineBelfast
ME-100389

CITY OF BELFAST BRIDGE ST LOT 2

2 Bridge St, Belfast, ME, 04915

CITY OF BELFAST BRIDGE ST LOT 2 is an EV charging location in Belfast, ME with 2 Level 2 charging ports up to 7 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2022
Max power
6.5 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • In town parking lot

    Source · NREL

Stations & ports

1 station · 2 ports
CITY OF BELFAST BRIDGE ST LOT 2 · L2 J1772 6.5 kW
ChargePoint Network
AC L2 · 6.5 kW

6.5 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 6.5 kW
1BJ1772· 6.5 kW

Estimated charging time

Level 2 (AC) · 6.5 kW
~8 h 58 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2 Bridge St · Belfast, ME · 04915

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is CITY OF BELFAST BRIDGE ST LOT 2 located?
CITY OF BELFAST BRIDGE ST LOT 2 is located at 2 Bridge St, Belfast, ME.
What kind of charging does CITY OF BELFAST BRIDGE ST LOT 2 offer?
CITY OF BELFAST BRIDGE ST LOT 2 offers Level 2 (AC) charging, with stations rated up to 6.5 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at CITY OF BELFAST BRIDGE ST LOT 2?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 58 min on 6.5 kW Level 2 (AC) charging at CITY OF BELFAST BRIDGE ST LOT 2. Actual times vary with vehicle, temperature, and station load.
What are CITY OF BELFAST BRIDGE ST LOT 2's charging hours?
24 hours daily
What charging network operates CITY OF BELFAST BRIDGE ST LOT 2?
CITY OF BELFAST BRIDGE ST LOT 2 is part of the ChargePoint network. See more ChargePoint charging across ME on SpotCharge.
Can anyone use the chargers at CITY OF BELFAST BRIDGE ST LOT 2?
Yes — CITY OF BELFAST BRIDGE ST LOT 2 is a publicly accessible charging location.
Is the CITY OF BELFAST BRIDGE ST LOT 2 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Maine · 2024
Plug-in vehicles
19K
#35 in US
Battery-electric
9.7K
51% of fleet
EVs per public port
9.2
2,065 ports listed

As of 2024, Maine had 18,900 plug-in vehicles registered — 9,700 fully battery-electric (51%) and 9,200 plug-in hybrid (49%). That ranks Maine #35 nationally and represents about 0.3% of all US plug-in registrations.

Across 2,065 publicly-listed ports in Maine (1,257 Level 2 and 808 DC fast), that works out to roughly 9.2 EVs per public port and 12 BEVs per DC fast port.

Maine has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Maine drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Maine market data →

More charging in Belfast

See all →

Quirk Ford of Belfast

Belfast, ME

DC FastFord Charge
1 station · 2 ports75 kW

CITY OF BELFAST BEAVER ST LOT

Belfast, ME

Level 2ChargePoint
1 station · 2 ports6.5 kW

REVISION ENERGY BELFAST CPE #2

Belfast, ME

DC FastChargePoint
2 stations · 2 ports125 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 5 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id220442
zip04915
cityBelfast
plus4—
stateME
ng_psi—
cng_psi—
countryUS
latitude44.430409
bd_blends—
longitude-69.010664
open_date2022-06-02
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-16T02:10:07Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameCITY OF BELFAST BRIDGE ST LOT 2
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "22092391",
    "22092401"
  ],
  "station": [
    "USCPIL12821731"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address2 Bridge St
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-16
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsIn town parking lot
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging