SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMaineSaco
ME-082450

23 Industrial Park Rd

23 Industrial Park Rd, Saco, ME, 04072

23 Industrial Park Rd is an EV charging location in Saco, ME with 3 Level 2 charging ports up to 12 kW on the ChargeLab network. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2026
Max power
11.5 kW
AC Level 2
Ports
3
ports
Hours
—
Pricing
—

Stations & ports

1 station · 3 ports
23 Industrial Park Rd · L2 J1772 11.5 kW
CHARGELAB
AC L2 · 11.5 kW

11.5 kW adds roughly 40 miles of range per hour for a typical EV.

Start session on CHARGELAB network →
1AJ1772· 11.5 kW
1BJ1772· 11.5 kW
1CJ1772· 11.5 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

23 Industrial Park Rd · Saco, ME · 04072

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is 23 Industrial Park Rd located?
23 Industrial Park Rd is located at 23 Industrial Park Rd, Saco, ME.
What kind of charging does 23 Industrial Park Rd offer?
23 Industrial Park Rd offers Level 2 (AC) charging, with stations rated up to 11.5 kW. There is 1 charging station and 3 total ports at this location.
How long does it take to charge an EV at 23 Industrial Park Rd?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at 23 Industrial Park Rd. Actual times vary with vehicle, temperature, and station load.
What charging network operates 23 Industrial Park Rd?
23 Industrial Park Rd is part of the ChargeLab network. See more ChargeLab charging across ME on SpotCharge.
Can anyone use the chargers at 23 Industrial Park Rd?
Yes — 23 Industrial Park Rd is a publicly accessible charging location.
Is the 23 Industrial Park Rd listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Maine · 2024
Plug-in vehicles
19K
#35 in US
Battery-electric
9.7K
51% of fleet
EVs per public port
9.2
2,065 ports listed

As of 2024, Maine had 18,900 plug-in vehicles registered — 9,700 fully battery-electric (51%) and 9,200 plug-in hybrid (49%). That ranks Maine #35 nationally and represents about 0.3% of all US plug-in registrations.

Across 2,065 publicly-listed ports in Maine (1,257 Level 2 and 808 DC fast), that works out to roughly 9.2 EVs per public port and 12 BEVs per DC fast port.

Maine has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Maine drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Maine market data →

More charging in Saco

See all →

Industrial Park Saco MB.HPC

Saco, ME

DC FastMercedes-Benz High-Power Charging
2 stations · 24 ports400 kW

IRONSIDES CHARGER 1

Saco, ME

Level 2ChargePoint
1 station · 2 ports7.7 kW

IRONSIDES STATION 3

Saco, ME

Level 2ChargePoint
1 station · 2 ports7.7 kW

Parks and Recreations, SACO

Saco, ME

Level 2FLO
1 station · 2 ports6.2 kW
Details
Phone
800-636-0986
Network
ChargeLab ↗
Access
Public access

Verified by NREL · 1 week ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id455615
zip04072
citySaco
plus4—
stateME
ng_psi—
cng_psi—
countryUS
latitude43.520689
bd_blends—
longitude-70.447634
open_date2026-03-18
rd_blends—
ev_networkCHARGELAB
ev_pricing—
updated_at2026-09-14T05:33:43Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_name23 Industrial Park Rd
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone800-636-0986
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "258665d3-aed4-45c9-8b38-bea6b608e95b**1",
    "871eeb43-4e7f-4104-b828-7183efff3449**1",
    "c39adf66-e1c1-4470-b7e8-d9b685d72f34**1"
  ],
  "station": [
    "125-1608f590bb8945b2996c36efed4bc628"
  ]
}
ev_network_webhttps://chargelab.co
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address23 Industrial Park Rd
funding_sources—
owner_type_code—
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "CHARGELAB",
    "connectors": {
      "J1772": {
        "power_kw": 11.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "CHARGELAB",
    "connectors": {
      "J1772": {
        "power_kw": 11.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "CHARGELAB",
    "connectors": {
      "J1772": {
        "power_kw": 11.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num3
access_days_time_fr—
date_last_confirmed2026-09-14
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging