Residence Inn BWI - Tesla Destination
Linthicum Heights, MD
Avalon at Arundel Crossing I is a other in Linthicum Heights, MD with 2 Level 2 charging ports up to 8 kW on the LOOP network. Pricing: $1 activation fee; $0.40 per kWh. 24 hours daily. Public access. Listing data from NREL, last confirmed July 2026.
7.7 kW adds roughly 25 miles of range per hour for a typical EV.
Start session on LOOP network →For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →
No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.
Charged here? Tell the next driver how it went:
No reviews yet — be the first to charge here and share your experience.
As of 2024, Maryland had 131,500 plug-in vehicles registered — 94,900 fully battery-electric (72%) and 36,600 plug-in hybrid (28%). That ranks Maryland #14 nationally and represents about 2.2% of all US plug-in registrations.
Across 5,775 publicly-listed ports in Maryland (3,838 Level 2 and 1,933 DC fast), that works out to roughly 22.8 EVs per public port and 49.1 BEVs per DC fast port.
Maryland's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.
Source: AFDC (data from Experian Information Solutions) · See full Maryland market data →
Linthicum Heights, MD
Linthicum Heights, MD
Linthicum Heights, MD
Linthicum Heights, MD
Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.
From U.S. DOE AFDC · Public domain
| id | 453165 |
|---|---|
| zip | 21090 |
| city | Linthicum Heights |
| plus4 | — |
| state | MD |
| ng_psi | — |
| cng_psi | — |
| country | US |
| latitude | 39.203056 |
| bd_blends | — |
| longitude | -76.675278 |
| open_date | 2025-12-17 |
| rd_blends | — |
| ev_network | LOOP |
| ev_pricing | $1 activation fee; $0.40 per kWh |
| updated_at | 2026-07-15T18:47:09Z |
| access_code | public |
| cng_has_rng | — |
| lng_has_rng | — |
| lpg_primary | — |
| status_code | E |
| bd_blends_fr | — |
| hy_is_retail | — |
| hy_pressures | — |
| hy_standards | — |
| rd_blends_fr | — |
| station_name | Avalon at Arundel Crossing I |
| ev_other_evse | — |
| ev_pricing_fr | — |
| expected_date | — |
| facility_type | OTHER |
| nps_unit_name | — |
| station_phone | 888-385-6671 |
| cards_accepted | A ACCOUNT_BALANCE ANDROID_PAY APPLE_PAY D M V |
| ev_dc_fast_num | — |
| ev_network_web | https://loopglobal.com |
| fuel_type_code | ELEC |
| geocode_status | GPS |
| hy_status_link | — |
| street_address | 811 Concorde Cir |
| funding_sources | — |
| owner_type_code | P |
| access_days_time | 24 hours daily |
| e85_blender_pump | — |
| lpg_nozzle_types | — |
| ng_vehicle_class | — |
| related_stations | — |
| cng_dispenser_num | — |
| cng_total_storage | — |
| cng_vehicle_class | — |
| ev_charging_units | [
{
"network": "LOOP",
"connectors": {
"J1772": {
"power_kw": 7.7,
"port_count": 1
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": null,
"port_count": 0
}
},
"port_count": 1,
"charging_level": "2",
"funding_sources": []
},
{
"network": "LOOP",
"connectors": {
"J1772": {
"power_kw": 7.7,
"port_count": 1
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": null,
"port_count": 0
}
},
"port_count": 1,
"charging_level": "2",
"funding_sources": []
}
] |
| lng_vehicle_class | — |
| ng_fill_type_code | — |
| restricted_access | No |
| access_detail_code | — |
| cng_fill_type_code | — |
| ev_connector_types | J1772 |
| ev_level1_evse_num | — |
| ev_level2_evse_num | 2 |
| access_days_time_fr | — |
| date_last_confirmed | 2026-07-15 |
| ev_renewable_source | — |
| cng_renewable_source | — |
| lng_renewable_source | — |
| cng_total_compression | — |
| ev_workplace_charging | No |
| maximum_vehicle_class | LD |
| rd_max_biodiesel_level | — |
| groups_with_access_code | Public |
| intersection_directions | — |
| e85_other_ethanol_blends | — |
| rd_blended_with_biodiesel | — |
| groups_with_access_code_fr | Public |
| intersection_directions_fr | — |