SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMarylandBeltsville
MD-599510

USDA IND.AVE DC / GWCC1 & GWCC2

5601 Sunnyside Ave, Beltsville, MD, 20705
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Fed gov
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
USDA IND.AVE DC / GWCC1 & GWCC2 · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

5601 Sunnyside Ave · Beltsville, MD · 20705

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is USDA IND.AVE DC / GWCC1 & GWCC2 located?
USDA IND.AVE DC / GWCC1 & GWCC2 is located at 5601 Sunnyside Ave, Beltsville, MD.
What kind of charging does USDA IND.AVE DC / GWCC1 & GWCC2 offer?
USDA IND.AVE DC / GWCC1 & GWCC2 offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at USDA IND.AVE DC / GWCC1 & GWCC2?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at USDA IND.AVE DC / GWCC1 & GWCC2. Actual times vary with vehicle, temperature, and station load.
What are USDA IND.AVE DC / GWCC1 & GWCC2's charging hours?
Open 24 hours
What charging network operates USDA IND.AVE DC / GWCC1 & GWCC2?
USDA IND.AVE DC / GWCC1 & GWCC2 is part of the Non-Networked network. See more Non-Networked charging across MD on SpotCharge.
Can anyone use the chargers at USDA IND.AVE DC / GWCC1 & GWCC2?
USDA IND.AVE DC / GWCC1 & GWCC2 is listed as by appointment access — check the details before visiting.
Is the USDA IND.AVE DC / GWCC1 & GWCC2 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Maryland · 2024
Plug-in vehicles
132K
#14 in US
Battery-electric
95K
72% of fleet
EVs per public port
24.4
5,397 ports listed

As of 2024, Maryland had 131,500 plug-in vehicles registered — 94,900 fully battery-electric (72%) and 36,600 plug-in hybrid (28%). That ranks Maryland #14 nationally and represents about 2.2% of all US plug-in registrations.

Across 5,397 publicly-listed ports in Maryland (3,619 Level 2 and 1,774 DC fast), that works out to roughly 24.4 EVs per public port and 53.5 BEVs per DC fast port.

Maryland's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Maryland market data →

More charging in Beltsville

See all →

RWV EV CHGRS STATION 2

Beltsville, MD

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

USDA - ARS - BELTSVILLE

Beltsville, MD

Level 2Non-Networked
1 station · 2 ports7.2 kW

EVsmart - Pepco - Beltsville Public Library

Beltsville, MD

Level 2SWTCH
1 station · 2 ports7.2 kW

SRE Beltsville

Beltsville, MD

Level 2Non-Networked
1 station · 4 ports7.2 kW
Details
Hours
Open 24 hours
Network
Non-Networked
Access
By appointment

Last updated · 6 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging