SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMarylandEllicott City
MD-422128

Old Town Construction

5304 Dorsey Hall Dr, Ellicott City, MD, 21042

Old Town Construction is a office building in Ellicott City, MD with 1 Level 2 charging port, not on a charging network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. By appointment. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏢Office building
📅Open since 2017
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
1
port
Hours
—
Pricing
—

Stations & ports

1 station · 1 port
Old Town Construction · L2 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1AJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

5304 Dorsey Hall Dr · Ellicott City, MD · 21042

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Old Town Construction located?
Old Town Construction is located at 5304 Dorsey Hall Dr, Ellicott City, MD.
What kind of charging does Old Town Construction offer?
Old Town Construction offers Level 2 (AC) charging. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at Old Town Construction?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at Old Town Construction. Actual times vary with vehicle, temperature, and station load.
Can anyone use the chargers at Old Town Construction?
Old Town Construction is listed as by appointment access — check the details before visiting. NREL lists it as workplace charging, mainly for employees.
Is the Old Town Construction listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Maryland · 2024
Plug-in vehicles
132K
#14 in US
Battery-electric
95K
72% of fleet
EVs per public port
22.8
5,775 ports listed

As of 2024, Maryland had 131,500 plug-in vehicles registered — 94,900 fully battery-electric (72%) and 36,600 plug-in hybrid (28%). That ranks Maryland #14 nationally and represents about 2.2% of all US plug-in registrations.

Across 5,775 publicly-listed ports in Maryland (3,838 Level 2 and 1,933 DC fast), that works out to roughly 22.8 EVs per public port and 49.1 BEVs per DC fast port.

Maryland's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Maryland market data →

More charging in Ellicott City

See all →

MT VILLA APTS BUILDING 1

Ellicott City, MD

Level 2ChargePoint
1 station · 2 ports6.5 kW

HOWARD COUNTY GHB BEAM EV

Ellicott City, MD

Level 2ChargePoint
1 station · 2 ports6.5 kW

HOWARD COUNTY MEADOWBRK LEFT

Ellicott City, MD

Level 2ChargePoint
1 station · 2 ports6.5 kW

MT VILLA APTS BUILDING 5

Ellicott City, MD

Level 2ChargePoint
1 station · 2 ports6.5 kW
Details
Network
Non-networked
Access
By appointment
Workplace charging, mainly for employees · From NREL
Ownership
Privately owned
From NREL

Verified by NREL · 6 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id88342
zip21042
cityEllicott City
plus4—
stateMD
ng_psi—
cng_psi—
countryUS
latitude39.245945
bd_blends—
longitude-76.833161
open_date2017-10-12
rd_blends—
ev_networkNon-Networked
ev_pricing—
updated_at2026-09-14T19:34:26Z
access_codeprivate
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameOld Town Construction
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeOFFICE_BLDG
nps_unit_name—
station_phone—
cards_accepted—
ev_dc_fast_num—
ev_network_web—
fuel_type_codeELEC
geocode_status200-9
hy_status_link—
street_address5304 Dorsey Hall Dr
funding_sources—
owner_type_codeP
access_days_timeFor employee use only
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_access—
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num1
access_days_time_fr—
date_last_confirmed2026-09-14
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingYes
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePrivate
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPrivé
intersection_directions_fr—
SpotCharge · Owner-listed EV charging