SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMarylandSilver Spring
MD-362230

TOWER COMPANIES PEARL #1

180 High Park Lane, Silver Spring, MD, 20910

TOWER COMPANIES PEARL #1 is an EV charging location in Silver Spring, MD with 2 Level 2 charging ports up to 7 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2025
Max power
6.5 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • Left Dual Port Charger

    Source · NREL

Stations & ports

1 station · 2 ports
TOWER COMPANIES PEARL #1 · L2 J1772 6.5 kW
ChargePoint Network
AC L2 · 6.5 kW

6.5 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 6.5 kW
1BJ1772· 6.5 kW

Estimated charging time

Level 2 (AC) · 6.5 kW
~8 h 58 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

180 High Park Lane · Silver Spring, MD · 20910

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is TOWER COMPANIES PEARL #1 located?
TOWER COMPANIES PEARL #1 is located at 180 High Park Lane, Silver Spring, MD.
What kind of charging does TOWER COMPANIES PEARL #1 offer?
TOWER COMPANIES PEARL #1 offers Level 2 (AC) charging, with stations rated up to 6.5 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at TOWER COMPANIES PEARL #1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 58 min on 6.5 kW Level 2 (AC) charging at TOWER COMPANIES PEARL #1. Actual times vary with vehicle, temperature, and station load.
What are TOWER COMPANIES PEARL #1's charging hours?
24 hours daily
What charging network operates TOWER COMPANIES PEARL #1?
TOWER COMPANIES PEARL #1 is part of the ChargePoint network. See more ChargePoint charging across MD on SpotCharge.
Can anyone use the chargers at TOWER COMPANIES PEARL #1?
Yes — TOWER COMPANIES PEARL #1 is a publicly accessible charging location.
Is the TOWER COMPANIES PEARL #1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Maryland · 2024
Plug-in vehicles
132K
#14 in US
Battery-electric
95K
72% of fleet
EVs per public port
22.8
5,775 ports listed

As of 2024, Maryland had 131,500 plug-in vehicles registered — 94,900 fully battery-electric (72%) and 36,600 plug-in hybrid (28%). That ranks Maryland #14 nationally and represents about 2.2% of all US plug-in registrations.

Across 5,775 publicly-listed ports in Maryland (3,838 Level 2 and 1,933 DC fast), that works out to roughly 22.8 EVs per public port and 49.1 BEVs per DC fast port.

Maryland's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Maryland market data →

More charging in Silver Spring

See all →

8455 Property

Silver Spring, MD

Level 2Blink
1 station · 6 ports6.2 kW

RWV EV CHGRS STATION 1

Silver Spring, MD

Level 2ChargePoint
1 station · 2 ports19.2 kW

CHUA VIEN AN STATION 1

Silver Spring, MD

Level 2ChargePoint
1 station · 2 ports6.5 kW

The Galaxy Apartments

Silver Spring, MD

Level 2LOOP
1 station · 6 ports7.7 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id375791
zip20910
citySilver Spring
plus4—
stateMD
ng_psi—
cng_psi—
countryUS
latitude38.991424
bd_blends—
longitude-77.033862
open_date2025-01-17
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-18T02:54:22Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameTOWER COMPANIES PEARL #1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "26770231",
    "26770241"
  ],
  "station": [
    "USCPIL16943051"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address180 High Park Lane
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsLeft Dual Port Charger
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging