SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMarylandThurmont
MD-309597

AMPCAP RR L3 - 1

203 Frederick Road, Thurmont, MD, 21788

AMPCAP RR L3 - 1 is an EV charging location in Thurmont, MD with 2 DC fast charging ports up to 125 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2026
Max power
125 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 2 ports
AMPCAP RR L3 - 1 · DCFC CCS 125 kW
ChargePoint Network
DC fast · 125 kW

125 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACCS· 125 kW
AMPCAP RR L3 - 1 · DCFC Tesla 125 kW
ChargePoint Network
DC fast · 125 kW

125 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
2ATesla· 125 kW

Estimated charging time

DC fast charging · 125 kW
~28 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

203 Frederick Road · Thurmont, MD · 21788

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is AMPCAP RR L3 - 1 located?
AMPCAP RR L3 - 1 is located at 203 Frederick Road, Thurmont, MD.
What kind of charging does AMPCAP RR L3 - 1 offer?
AMPCAP RR L3 - 1 offers DC fast charging, with stations rated up to 125 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at AMPCAP RR L3 - 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 28 min on 125 kW DC fast charging at AMPCAP RR L3 - 1. Actual times vary with vehicle, temperature, and station load.
What are AMPCAP RR L3 - 1's charging hours?
24 hours daily
What charging network operates AMPCAP RR L3 - 1?
AMPCAP RR L3 - 1 is part of the ChargePoint network. See more ChargePoint charging across MD on SpotCharge.
Can anyone use the chargers at AMPCAP RR L3 - 1?
Yes — AMPCAP RR L3 - 1 is a publicly accessible charging location.
Is the AMPCAP RR L3 - 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Maryland · 2024
Plug-in vehicles
132K
#14 in US
Battery-electric
95K
72% of fleet
EVs per public port
22.8
5,777 ports listed

As of 2024, Maryland had 131,500 plug-in vehicles registered — 94,900 fully battery-electric (72%) and 36,600 plug-in hybrid (28%). That ranks Maryland #14 nationally and represents about 2.2% of all US plug-in registrations.

Across 5,777 publicly-listed ports in Maryland (3,838 Level 2 and 1,935 DC fast), that works out to roughly 22.8 EVs per public port and 49 BEVs per DC fast port.

Maryland's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Maryland market data →

More DC fast charging

DC fast charging in Thurmont →DC fast charging in Maryland →ChargePoint in Maryland →

More charging in Thurmont

See all →

POTOMAC EDISON CATOCTIN FURNAC

Thurmont, MD

Level 2ChargePoint
1 station · 2 ports6.5 kW

Catoctin Mountain Park - Headquarters

Thurmont, MD

Level 2
1 station · 1 port

Catoctin Mountain Park - Visitor Center

Thurmont, MD

Level 2
1 station · 2 ports

Naval Support Facility - Thurmont - Camp David

Thurmont, MD

Level 2
1 station · 1 port
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 1 week ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id458447
zip21788
cityThurmont
plus4—
stateMD
ng_psi—
cng_psi—
countryUS
latitude39.613162
bd_blends—
longitude-77.419541
open_date2026-04-30
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-14T03:13:59Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameAMPCAP RR L3 - 1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "30797761"
  ],
  "station": [
    "USCPIL19678251"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address203 Frederick Road
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": 125,
        "port_count": 1
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 125,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772COMBO, TESLA
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-14
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging