SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMassachusettsChatham
MA-901300

Chatham Eldredge Parking - Level 2 chargers

365 Main St, Chatham, MA, 02633

Chatham Eldredge Parking - Level 2 chargers is an EV charging location in Chatham, MA with 4 Level 2 charging ports up to 19 kW on the FLO network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2025
Max power
19.2 kW
AC Level 2
Ports
4
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

1 station · 4 ports
Chatham Eldredge Parking - Level 2 chargers · L2 J1772 19.2 kW
FLO
AC L2 · 19.2 kW

19.2 kW adds roughly 65 miles of range per hour for a typical EV.

Start session on FLO network →
1AJ1772· 19.2 kW
1BJ1772· 19.2 kW
1CJ1772· 19.2 kW
1DJ1772· 19.2 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

365 Main St · Chatham, MA · 02633

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Chatham Eldredge Parking - Level 2 chargers located?
Chatham Eldredge Parking - Level 2 chargers is located at 365 Main St, Chatham, MA.
What kind of charging does Chatham Eldredge Parking - Level 2 chargers offer?
Chatham Eldredge Parking - Level 2 chargers offers Level 2 (AC) charging, with stations rated up to 19.2 kW. There is 1 charging station and 4 total ports at this location.
How long does it take to charge an EV at Chatham Eldredge Parking - Level 2 chargers?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at Chatham Eldredge Parking - Level 2 chargers. Actual times vary with vehicle, temperature, and station load.
What are Chatham Eldredge Parking - Level 2 chargers's charging hours?
24 hours daily
What charging network operates Chatham Eldredge Parking - Level 2 chargers?
Chatham Eldredge Parking - Level 2 chargers is part of the FLO network. See more FLO charging across MA on SpotCharge.
Can anyone use the chargers at Chatham Eldredge Parking - Level 2 chargers?
Yes — Chatham Eldredge Parking - Level 2 chargers is a publicly accessible charging location.
Is the Chatham Eldredge Parking - Level 2 chargers listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Massachusetts · 2024
Plug-in vehicles
143K
#10 in US
Battery-electric
91K
64% of fleet
EVs per public port
16.1
8,919 ports listed

As of 2024, Massachusetts had 143,300 plug-in vehicles registered — 91,100 fully battery-electric (64%) and 52,200 plug-in hybrid (36%). That ranks Massachusetts #10 nationally and represents about 2.4% of all US plug-in registrations.

Across 8,919 publicly-listed ports in Massachusetts (6,521 Level 2 and 2,398 DC fast), that works out to roughly 16.1 EVs per public port and 38 BEVs per DC fast port.

Massachusetts has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Massachusetts drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Massachusetts market data →

More charging in Chatham

See all →

Chatham Eldredge Parking - Level 3 Fast Charger

Chatham, MA

DC FastFLO
2 stations · 8 ports50 kW

CAPE_ASSOCIATES MONOMOY

Chatham, MA

DC FastChargePoint
2 stations · 2 ports62 kW

CAPE_ASSOCIATES CHATHAM LIGHT

Chatham, MA

DC FastChargePoint
2 stations · 2 ports62 kW

CBI BARS INN ST1

Chatham, MA

Level 2ChargePoint
1 station · 2 ports

Plan a trip around here

This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.

the Cape →All Massachusetts destinations →
Details
Hours
24 hours daily
Phone
888-356-8911
Network
FLO ↗
Access
Public access

Verified by NREL · 1 day ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id377575
zip02633
cityChatham
plus4—
stateMA
ng_psi—
cng_psi—
countryUS
latitude41.678612
bd_blends—
longitude-69.95342
open_date2025-02-01
rd_blends—
ev_networkFLO
ev_pricing—
updated_at2026-09-19T02:53:35Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameChatham Eldredge Parking - Level 2 chargers
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-356-8911
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "43e690fe-0000-4ac7-9aa8-6bfc588ce6aa",
    "8ee4486d-480c-4e72-9fd4-a28c626744d2",
    "ad525ee6-f6cb-412b-abcc-15c7da94bf48",
    "f676da4c-4893-497b-8ad1-2bb5e88195d4"
  ],
  "station": [
    "d853c99a-11db-4c83-94d9-0467b220097d"
  ]
}
ev_network_webhttps://www.flo.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address365 Main St
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "FLO",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "FLO",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "FLO",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "FLO",
    "connectors": {
      "J1772": {
        "power_kw": 19.2,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num4
access_days_time_fr—
date_last_confirmed2026-09-19
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging