SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMassachusettsLowell
MA-861234

National Grid - Lowell

775 Dutton St, Lowell, MA, 01853
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Utility
Max power
7.2 kW
AC Level 2
Ports
7
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 7 ports
National Grid - Lowell · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A
1EJ1772· 7.2 kW· 240V/30A
1FJ1772· 7.2 kW· 240V/30A
1GJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

775 Dutton St · Lowell, MA · 01853

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is National Grid - Lowell located?
National Grid - Lowell is located at 775 Dutton St, Lowell, MA.
What kind of charging does National Grid - Lowell offer?
National Grid - Lowell offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 7 total ports at this location.
How long does it take to charge an EV at National Grid - Lowell?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at National Grid - Lowell. Actual times vary with vehicle, temperature, and station load.
What are National Grid - Lowell's charging hours?
Open 24 hours
What charging network operates National Grid - Lowell?
National Grid - Lowell is part of the Non-Networked network. See more Non-Networked charging across MA on SpotCharge.
Can anyone use the chargers at National Grid - Lowell?
National Grid - Lowell is listed as by appointment access — check the details before visiting.
Is the National Grid - Lowell listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Massachusetts · 2024
Plug-in vehicles
143K
#10 in US
Battery-electric
91K
64% of fleet
EVs per public port
17.8
8,045 ports listed

As of 2024, Massachusetts had 143,300 plug-in vehicles registered — 91,100 fully battery-electric (64%) and 52,200 plug-in hybrid (36%). That ranks Massachusetts #10 nationally and represents about 2.4% of all US plug-in registrations.

Across 8,045 publicly-listed ports in Massachusetts (5,896 Level 2 and 2,149 DC fast), that works out to roughly 17.8 EVs per public port and 42.4 BEVs per DC fast port.

Massachusetts has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Massachusetts drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Massachusetts market data →

More charging in Lowell

See all →

Farley White

Lowell, MA

DC FastRED_E
1 station · 6 ports50 kW

330JACKSON 330 JACKSON 2

Lowell, MA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

Lowell, MA - Tesla Supercharger

Lowell, MA

DC FastTesla
1 station · 12 ports50 kW

55 Technology Drive

Lowell, MA

Level 2FLO
1 station · 4 ports7.2 kW
Details
Hours
Open 24 hours
Network
Non-Networked
Access
By appointment

Data from NREL

SpotCharge · Owner-listed EV charging