SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMassachusettsCanton
MA-853757

Trillium Brewery - Tesla Supercharger

100 Royall St, Canton, MA, 02021
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Brewery distillery winery
Max power
50 kW
DC fast
Ports
20
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

2 stations · 20 ports
Trillium Brewery - Tesla Supercharger · DCFC CCS
Tesla
DC fast · 50 kW
Start session on Tesla network →
1ACCS· 50 kW· 480V/100A
1BCCS· 50 kW· 480V/100A
1CCCS· 50 kW· 480V/100A
1DCCS· 50 kW· 480V/100A
1ECCS· 50 kW· 480V/100A
1FCCS· 50 kW· 480V/100A
1GCCS· 50 kW· 480V/100A
1HCCS· 50 kW· 480V/100A
1ICCS· 50 kW· 480V/100A
1JCCS· 50 kW· 480V/100A
Trillium Brewery - Tesla Supercharger · DCFC Tesla
Tesla
DC fast · 50 kW
Start session on Tesla network →
2ATesla· 50 kW· 480V/100A
2BTesla· 50 kW· 480V/100A
2CTesla· 50 kW· 480V/100A
2DTesla· 50 kW· 480V/100A
2ETesla· 50 kW· 480V/100A
2FTesla· 50 kW· 480V/100A
2GTesla· 50 kW· 480V/100A
2HTesla· 50 kW· 480V/100A
2ITesla· 50 kW· 480V/100A
2JTesla· 50 kW· 480V/100A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

100 Royall St · Canton, MA · 02021

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Trillium Brewery - Tesla Supercharger located?
Trillium Brewery - Tesla Supercharger is located at 100 Royall St, Canton, MA.
What kind of charging does Trillium Brewery - Tesla Supercharger offer?
Trillium Brewery - Tesla Supercharger offers DC fast charging, with stations rated up to 50 kW. There are 2 charging stations and 20 total ports at this location.
How long does it take to charge an EV at Trillium Brewery - Tesla Supercharger?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging at Trillium Brewery - Tesla Supercharger. Actual times vary with vehicle, temperature, and station load.
What are Trillium Brewery - Tesla Supercharger's charging hours?
Open 24 hours
What charging network operates Trillium Brewery - Tesla Supercharger?
Trillium Brewery - Tesla Supercharger is part of the Tesla network. See more Tesla charging across MA on SpotCharge.
Can anyone use the chargers at Trillium Brewery - Tesla Supercharger?
Yes — Trillium Brewery - Tesla Supercharger is a publicly accessible charging location.
Is the Trillium Brewery - Tesla Supercharger listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Massachusetts · 2024
Plug-in vehicles
143K
#10 in US
Battery-electric
91K
64% of fleet
EVs per public port
17.8
8,045 ports listed

As of 2024, Massachusetts had 143,300 plug-in vehicles registered — 91,100 fully battery-electric (64%) and 52,200 plug-in hybrid (36%). That ranks Massachusetts #10 nationally and represents about 2.4% of all US plug-in registrations.

Across 8,045 publicly-listed ports in Massachusetts (5,896 Level 2 and 2,149 DC fast), that works out to roughly 17.8 EVs per public port and 42.4 BEVs per DC fast port.

Massachusetts has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Massachusetts drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Massachusetts market data →

More charging in Canton

See all →

Department of Public Health Pappas Rehabilitation

Canton, MA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

PEQUITSIDE PEQUITSIDE-1

Canton, MA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

PEQUITSIDE PEQUITSIDE-2

Canton, MA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

PEQUITSIDE PEQUITSIDE-3

Canton, MA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
877-798-3752
Network
Tesla ↗
Access
Public access

Data from NREL

SpotCharge · Owner-listed EV charging