SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMassachusettsLawrence
MA-782438

ACS Development Corporation

160 Winthrop Ave, Lawrence, MA, 01843
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Shopping center
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
ACS Development Corporation · L2 J1772
AMPUP
AC L2 · 7.2 kW
Start session on AMPUP network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

160 Winthrop Ave · Lawrence, MA · 01843

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is ACS Development Corporation located?
ACS Development Corporation is located at 160 Winthrop Ave, Lawrence, MA.
What kind of charging does ACS Development Corporation offer?
ACS Development Corporation offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at ACS Development Corporation?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at ACS Development Corporation. Actual times vary with vehicle, temperature, and station load.
What are ACS Development Corporation's charging hours?
Open 24 hours
What charging network operates ACS Development Corporation?
ACS Development Corporation is part of the AMPUP network. See more AMPUP charging across MA on SpotCharge.
Can anyone use the chargers at ACS Development Corporation?
Yes — ACS Development Corporation is a publicly accessible charging location.
Is the ACS Development Corporation listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Massachusetts · 2024
Plug-in vehicles
143K
#10 in US
Battery-electric
91K
64% of fleet
EVs per public port
17.8
8,045 ports listed

As of 2024, Massachusetts had 143,300 plug-in vehicles registered — 91,100 fully battery-electric (64%) and 52,200 plug-in hybrid (36%). That ranks Massachusetts #10 nationally and represents about 2.4% of all US plug-in registrations.

Across 8,045 publicly-listed ports in Massachusetts (5,896 Level 2 and 2,149 DC fast), that works out to roughly 17.8 EVs per public port and 42.4 BEVs per DC fast port.

Massachusetts has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Massachusetts drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Massachusetts market data →

More charging in Lawrence

See all →

Essex County Sheriff's Office Lawrence

Lawrence, MA

Level 2Non-Networked
1 station · 2 ports7.2 kW

Department of Conservation & Recreation Lawrence Heritage State Park

Lawrence, MA

Level 2Non-Networked
1 station · 3 ports7.2 kW

Armand Michael Hyatt Apartments Phase 2

Lawrence, MA

Level 2FLO
1 station · 4 ports7.2 kW

Lawrence General Hospital

Lawrence, MA

Level 2FLO
1 station · 10 ports7.2 kW
Details
Hours
Open 24 hours
Phone
833-692-6787
Network
AMPUP ↗
Access
Public access

Data from NREL

SpotCharge · Owner-listed EV charging