SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMassachusettsBoston
MA-714710

Environmental Protection Agency

5 Post Office Square, Boston, MA, 02109
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Fed gov
📅Open since 2018
🚚Fits Light-duty (cars, SUVs)
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
Environmental Protection Agency · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

5 Post Office Square · Boston, MA · 02109

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Environmental Protection Agency located?
Environmental Protection Agency is located at 5 Post Office Square, Boston, MA.
What kind of charging does Environmental Protection Agency offer?
Environmental Protection Agency offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Environmental Protection Agency?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Environmental Protection Agency. Actual times vary with vehicle, temperature, and station load.
What are Environmental Protection Agency's charging hours?
Open 24 hours
What charging network operates Environmental Protection Agency?
Environmental Protection Agency is part of the Non-Networked network. See more Non-Networked charging across MA on SpotCharge.
Can anyone use the chargers at Environmental Protection Agency?
Environmental Protection Agency is listed as by appointment access — check the details before visiting.
Is the Environmental Protection Agency listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Massachusetts · 2024
Plug-in vehicles
143K
#10 in US
Battery-electric
91K
64% of fleet
EVs per public port
17.8
8,045 ports listed

As of 2024, Massachusetts had 143,300 plug-in vehicles registered — 91,100 fully battery-electric (64%) and 52,200 plug-in hybrid (36%). That ranks Massachusetts #10 nationally and represents about 2.4% of all US plug-in registrations.

Across 8,045 publicly-listed ports in Massachusetts (5,896 Level 2 and 2,149 DC fast), that works out to roughly 17.8 EVs per public port and 42.4 BEVs per DC fast port.

Massachusetts has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Massachusetts drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Massachusetts market data →

More charging in Boston

See all →

Fan Pier Garage Xeal Stations

Boston, MA

Level 2XEAL
1 station · 20 ports7.2 kW

CITY OF BOSTON MUNI LOT 15 #2

Boston, MA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

City of Boston - 12 Drydock (Garage)

Boston, MA

Level 2NOODOE
1 station · 11 ports7.2 kW

City of Boston - V1 Parking Garage

Boston, MA

Level 2NOODOE
1 station · 15 ports7.2 kW
Details
Hours
Open 24 hours
Network
Non-Networked
Access
By appointment

Verified by NREL · 6 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id98675
zip02109
cityBoston
plus4—
stateMA
ng_psi—
cng_psi—
countryUS
latitude42.357412
bd_blends—
longitude-71.056588
open_date2018-04-01
rd_blends—
ev_networkNon-Networked
ev_pricing—
updated_at2026-02-02T23:16:24Z
access_codeprivate
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameEnvironmental Protection Agency
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeFED_GOV
nps_unit_name—
station_phone—
cards_accepted—
ev_dc_fast_num—
ev_network_web—
federal_agency
{
  "id": 20,
  "code": "EPA",
  "name": "U.S. Environmental Protection Agency"
}
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address5 Post Office Square
funding_sources—
owner_type_codeFG
access_days_timeFleet use only
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_access—
access_detail_codeGOVERNMENT
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2025-12-12
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingYes
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePrivate - Government only
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPrivé - Réservé au gouvernement
intersection_directions_fr—
SpotCharge · Owner-listed EV charging