SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMassachusettsBoston
MA-691321

400 SUMMER ST 400 SUMMERP1-2

400 Summer St, Boston, MA, 02210

400 SUMMER ST 400 SUMMERP1-2 is an EV charging location in Boston, MA with 2 DC fast charging ports up to 63 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2024
Max power
62.5 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • P1 West

    Source · NREL

Stations & ports

2 stations · 2 ports
400 SUMMER ST 400 SUMMERP1-2 · DCFC CHAdeMO 62.5 kW
ChargePoint Network
DC fast · 62.5 kW

62.5 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACHAdeMO· 62.5 kW
400 SUMMER ST 400 SUMMERP1-2 · DCFC CCS 62 kW
ChargePoint Network
DC fast · 62 kW

62 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
2ACCS· 62 kW

Estimated charging time

DC fast charging · 62.5 kW
~56 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

400 Summer St · Boston, MA · 02210

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is 400 SUMMER ST 400 SUMMERP1-2 located?
400 SUMMER ST 400 SUMMERP1-2 is located at 400 Summer St, Boston, MA.
What kind of charging does 400 SUMMER ST 400 SUMMERP1-2 offer?
400 SUMMER ST 400 SUMMERP1-2 offers DC fast charging, with stations rated up to 62.5 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at 400 SUMMER ST 400 SUMMERP1-2?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 56 min on 62.5 kW DC fast charging at 400 SUMMER ST 400 SUMMERP1-2. Actual times vary with vehicle, temperature, and station load.
What are 400 SUMMER ST 400 SUMMERP1-2's charging hours?
24 hours daily
What charging network operates 400 SUMMER ST 400 SUMMERP1-2?
400 SUMMER ST 400 SUMMERP1-2 is part of the ChargePoint network. See more ChargePoint charging across MA on SpotCharge.
Can anyone use the chargers at 400 SUMMER ST 400 SUMMERP1-2?
Yes — 400 SUMMER ST 400 SUMMERP1-2 is a publicly accessible charging location.
Is the 400 SUMMER ST 400 SUMMERP1-2 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Massachusetts · 2024
Plug-in vehicles
143K
#10 in US
Battery-electric
91K
64% of fleet
EVs per public port
16.1
8,919 ports listed

As of 2024, Massachusetts had 143,300 plug-in vehicles registered — 91,100 fully battery-electric (64%) and 52,200 plug-in hybrid (36%). That ranks Massachusetts #10 nationally and represents about 2.4% of all US plug-in registrations.

Across 8,919 publicly-listed ports in Massachusetts (6,521 Level 2 and 2,398 DC fast), that works out to roughly 16.1 EVs per public port and 38 BEVs per DC fast port.

Massachusetts has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Massachusetts drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Massachusetts market data →

More DC fast charging

DC fast charging in Boston →DC fast charging in Massachusetts →ChargePoint in Massachusetts →

More charging in Boston

See all →

421 PARK DC SPOT 1

Boston, MA

DC FastChargePoint
2 stations · 2 ports62.5 kW

25 District Ave - Tesla Destination

Boston, MA

Level 2Tesla Destination
2 stations · 8 ports

Beach Street Garage - Tesla Destination

Boston, MA

Level 2Tesla Destination
2 stations · 4 ports

421 PARK B2 - SPOT 176

Boston, MA

Level 2ChargePoint
1 station · 2 ports6.5 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id332457
zip02210
cityBoston
plus4—
stateMA
ng_psi—
cng_psi—
countryUS
latitude42.348728
bd_blends—
longitude-71.046315
open_date2024-04-17
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-18T02:35:08Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_name400 SUMMER ST 400 SUMMERP1-2
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "24761441"
  ],
  "station": [
    "USCPIL15241801"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address400 Summer St
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 62.5,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 62,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsP1 West
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging