SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMassachusettsCambridge
MA-548550

City of Cambridge Lot 8

375 Green Street, Cambridge, MA, 02139
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
6.4 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
Tiered pricing
$.15/hour + $.18/kWh + parking meter

About this location

Paying at parking meter still required. 2 hour limit from 8am-6pm. 4 hour limit from 6pm-10pm.

Finding this location

  • Overnight charging allowed

    Source · OpenChargeMap

Stations & ports

1 station · 2 ports
City of Cambridge Lot 8
ChargePoint
AC L2 · 6.4 kW
1AJ1772· 6.4 kW· 200V/32A
1BJ1772· 6.4 kW· 200V/32A

Estimated charging time

Level 2 (AC) · 6.4 kW
~9 h 7 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

375 Green Street · Cambridge, MA · 02139

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is City of Cambridge Lot 8 located?
City of Cambridge Lot 8 is located at 375 Green Street, Cambridge, MA.
What kind of charging does City of Cambridge Lot 8 offer?
City of Cambridge Lot 8 offers Level 2 (AC) charging, with stations rated up to 6.4 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at City of Cambridge Lot 8?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 9 h 7 min on 6.4 kW Level 2 (AC) charging at City of Cambridge Lot 8. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at City of Cambridge Lot 8?
$.15/hour + $.18/kWh + parking meter
What are City of Cambridge Lot 8's charging hours?
Open 24 hours
What charging network operates City of Cambridge Lot 8?
City of Cambridge Lot 8 is part of the ChargePoint network. See more ChargePoint charging across MA on SpotCharge.
Can anyone use the chargers at City of Cambridge Lot 8?
Yes — City of Cambridge Lot 8 is a publicly accessible charging location.
Is the City of Cambridge Lot 8 listing owner-managed?
Not yet. This page was generated from open charging data (OpenChargeMap) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Massachusetts · 2024
Plug-in vehicles
143K
#10 in US
Battery-electric
91K
64% of fleet
EVs per public port
17.8
8,045 ports listed

As of 2024, Massachusetts had 143,300 plug-in vehicles registered — 91,100 fully battery-electric (64%) and 52,200 plug-in hybrid (36%). That ranks Massachusetts #10 nationally and represents about 2.4% of all US plug-in registrations.

Across 8,045 publicly-listed ports in Massachusetts (5,896 Level 2 and 2,149 DC fast), that works out to roughly 17.8 EVs per public port and 42.4 BEVs per DC fast port.

Massachusetts has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Massachusetts drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Massachusetts market data →

More charging in Cambridge

See all →

Blackstone Science Square - Parking Lot

Cambridge, MA

Level 2EVOKE
1 station · 2 ports7.2 kW

CITYOFCAMBRIDGE MASS AVE - 2

Cambridge, MA

Level 2ChargePoint Network
1 station · 1 port7.2 kW

200 Cambridgepark drive

Cambridge, MA

Level 2AMPUP
1 station · 4 ports7.2 kW

950 Massachusetts Ave

Cambridge, MA

Level 2LOOP
1 station · 30 ports7.2 kW
Details
Hours
Open 24 hours
Pricing
$.15/hour + $.18/kWh + parking meter
Phone
617-349-4604
Network
ChargePoint ↗
Access
Public access

Data from OpenChargeMap

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

OpenChargeMap16 fields▾

From OpenChargeMap · CC-BY-SA 4.0

ID128789
UUID63C01853-D2A4-4C1E-9B5B-D09315D96D84
UsageCost$.15/hour + $.18/kWh + parking meter
OperatorID5
AddressInfo
{
  "ID": 129135,
  "Town": "Cambridge",
  "Title": "City of Cambridge Lot 8",
  "Latitude": 42.3658172953955,
  "Postcode": "02139",
  "CountryID": 2,
  "Longitude": -71.1056503738328,
  "RelatedURL": "https://www.cambridgema.gov/cdd/transportation/programs/currentprograms/electricvehicles",
  "AddressLine1": "375 Green Street",
  "ContactEmail": "bcooke@cambridgema.gov",
  "DistanceUnit": 0,
  "AccessComments": "Paying at parking meter still required. 2 hour limit from 8am-6pm. 4 hour limit from 6pm-10pm.",
  "StateOrProvince": "Massachusetts",
  "ContactTelephone1": "617-349-4604"
}
Connections
[
  {
    "ID": 180185,
    "Amps": 32,
    "LevelID": 2,
    "PowerKW": 6.4,
    "Voltage": 200,
    "Quantity": 2,
    "StatusTypeID": 50,
    "CurrentTypeID": 10,
    "ConnectionTypeID": 1
  }
]
DateCreated2019-06-27T17:54:00Z
UsageTypeID1
OperatorInfo
{
  "ID": 5,
  "Title": "ChargePoint",
  "Comments": "GB*CPI,AT*HTB",
  "BookingURL": null,
  "WebsiteURL": "http://www.chargepoint.net/",
  "AddressInfo": null,
  "ContactEmail": null,
  "FaultReportEmail": null,
  "IsRestrictedEdit": false,
  "IsPrivateIndividual": false,
  "PhonePrimaryContact": "1-408-841-4500",
  "PhoneSecondaryContact": null
}
StatusTypeID50
DataProviderID1
NumberOfPoints1
GeneralCommentsOvernight charging allowed
DateLastVerified2024-08-13T07:37:00Z
DateLastStatusUpdate2024-08-13T07:37:00Z
SubmissionStatusTypeID200
SpotCharge · Data via OpenChargeMap