SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMassachusettsNorthborough
MA-510119

Central Massachusetts Mosquito Control Project

111 Otis St, Northborough, MA, 01532
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍State gov
Max power
7.2 kW
AC Level 2
Ports
8
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 8 ports
Central Massachusetts Mosquito Control Project · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A
1EJ1772· 7.2 kW· 240V/30A
1FJ1772· 7.2 kW· 240V/30A
1GJ1772· 7.2 kW· 240V/30A
1HJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

111 Otis St · Northborough, MA · 01532

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Central Massachusetts Mosquito Control Project located?
Central Massachusetts Mosquito Control Project is located at 111 Otis St, Northborough, MA.
What kind of charging does Central Massachusetts Mosquito Control Project offer?
Central Massachusetts Mosquito Control Project offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 8 total ports at this location.
How long does it take to charge an EV at Central Massachusetts Mosquito Control Project?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Central Massachusetts Mosquito Control Project. Actual times vary with vehicle, temperature, and station load.
What are Central Massachusetts Mosquito Control Project's charging hours?
Open 24 hours
What charging network operates Central Massachusetts Mosquito Control Project?
Central Massachusetts Mosquito Control Project is part of the Non-Networked network. See more Non-Networked charging across MA on SpotCharge.
Can anyone use the chargers at Central Massachusetts Mosquito Control Project?
Central Massachusetts Mosquito Control Project is listed as by appointment access — check the details before visiting.
Is the Central Massachusetts Mosquito Control Project listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Massachusetts · 2024
Plug-in vehicles
143K
#10 in US
Battery-electric
91K
64% of fleet
EVs per public port
17.8
8,045 ports listed

As of 2024, Massachusetts had 143,300 plug-in vehicles registered — 91,100 fully battery-electric (64%) and 52,200 plug-in hybrid (36%). That ranks Massachusetts #10 nationally and represents about 2.4% of all US plug-in registrations.

Across 8,045 publicly-listed ports in Massachusetts (5,896 Level 2 and 2,149 DC fast), that works out to roughly 17.8 EVs per public port and 42.4 BEVs per DC fast port.

Massachusetts has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Massachusetts drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Massachusetts market data →

More charging in Northborough

See all →

10 Bearfoot - CCLLC

Northborough, MA

Level 2AMPUP
1 station · 8 ports7.2 kW

Swtch Energy

Northborough, MA

Level 2SWTCH
1 station · 8 ports7.2 kW

National Grid - Northborough

Northborough, MA

Level 2Non-Networked
2 stations · 13 ports7.2 kW

NEFC Soccer Training Center

Northborough, MA

DC FastRED_E
1 station · 4 ports120 kW
Details
Hours
Open 24 hours
Network
Non-Networked
Access
By appointment

Last updated · 4 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging