SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMassachusettsBeverly
MA-284770

AMPHENOL STATION 1

72 Cherry Hill Drive, Beverly, MA, 01915
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
AMPHENOL STATION 1 · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

72 Cherry Hill Drive · Beverly, MA · 01915

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is AMPHENOL STATION 1 located?
AMPHENOL STATION 1 is located at 72 Cherry Hill Drive, Beverly, MA.
What kind of charging does AMPHENOL STATION 1 offer?
AMPHENOL STATION 1 offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at AMPHENOL STATION 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at AMPHENOL STATION 1. Actual times vary with vehicle, temperature, and station load.
What are AMPHENOL STATION 1's charging hours?
Open 24 hours
What charging network operates AMPHENOL STATION 1?
AMPHENOL STATION 1 is part of the ChargePoint Network network. See more ChargePoint Network charging across MA on SpotCharge.
Can anyone use the chargers at AMPHENOL STATION 1?
Yes — AMPHENOL STATION 1 is a publicly accessible charging location.
Is the AMPHENOL STATION 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Massachusetts · 2024
Plug-in vehicles
143K
#10 in US
Battery-electric
91K
64% of fleet
EVs per public port
17.8
8,045 ports listed

As of 2024, Massachusetts had 143,300 plug-in vehicles registered — 91,100 fully battery-electric (64%) and 52,200 plug-in hybrid (36%). That ranks Massachusetts #10 nationally and represents about 2.4% of all US plug-in registrations.

Across 8,045 publicly-listed ports in Massachusetts (5,896 Level 2 and 2,149 DC fast), that works out to roughly 17.8 EVs per public port and 42.4 BEVs per DC fast port.

Massachusetts has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Massachusetts drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Massachusetts market data →

More charging in Beverly

See all →

CANVAS

Beverly, MA

Level 2Blink Network
1 station · 2 ports7.2 kW

Link 480

Beverly, MA

Level 2Blink Network
1 station · 2 ports7.2 kW

LONG HILL LONG HILL

Beverly, MA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

ENDICOTT EC INN 2

Beverly, MA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging